Contractor · General building
Joseph N. McPhee, II
15 building permits since 2021 in Scituate town, RI; Bristol town, RI and West Warwick town, RI, across 3 counties — $4,380,499 in reported job value over 15 permits that state one.
- Building permits
- 15
- Reported job value
- $4.4M
- Active
- 2021–2026
- Latest permit
- Oct 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Scituate town, RI4
- Bristol town, RI3
- West Warwick town, RI2
- Lincoln town, RI2
- Coventry town, RI1
- Warwick city, RI1
- North Smithfield town, RI1
- Providence city, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2023 | 3 |
| 2024 | 2 |
| 2025 | 4 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels7
- Demolition6
- Accessory dwelling units4
- Additions4
- Windows & doors4
- Roofing3
- HVAC2
- Kitchens2
- Bathrooms2
- Grading & excavation1
Permit types
As the building departments classify them.
- Building Permit11
- General Building - Addition, Renovation, Remodel, Permit2
- Electrical Permit1
- Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 9, 2026 | General Building - Addition, Renovation, Remodel, Permit | Phase II Alterations for Proposed ADU at 67 Dexter Road include: 1. The reduction of Primary Residence bedroom count from (3) to (2). The structural reduction b | Scituate Town | $80,000 |
| Sep 17, 2026 | Building Permit | Small Addition (5'X9') for utility room to back right side of existing 1 Story SFR. Garage Portico on Site plan is Opption for future Phase and is NIC for this | West Warwick Town | $10,000 |
| Sep 10, 2026 | Electrical Permit | ADU Fit out to existing Accessory Structure | Scituate Town | $4,000 |
| Sep 4, 2026 | Plumbing Permit | ADU Alterations to existing Accessory Structure 1 Bed Room Fit out includes EHWH, Kitchen sink, (alt DW), (1) full bath Shower toilet vanity, ADU sanitary conne | Scituate Town | $4,500 |
| Aug 10, 2026 | General Building - Addition, Renovation, Remodel, Permit | Phase I - Base Building Selective Demolition and Select ADU Area Structural Repairs in preparation for Phase II - ADU Fit out Alterations | Scituate Town | $25,000 |
| Dec 12, 2025 | Building Permit | Alterations to existing single family residence including: 1. Selective demolition of interior finishes & doors, second floor roof structure. 2. Replacement of | Lincoln Town | $68,000 |
| Sep 4, 2025 | Building Permit | Scope is now limited to temporary shoring, selective demolition & replacement of existing unsuitable foundation & slab on grade of existing 24'x24' accessory st | Coventry Town | $75,000 |
| Aug 14, 2025 | Building Permit | Alterations and second floor addition to existing SFR. | Warwick City | $59,999 |
Permit status
Where its permits stand, as the departments report them.
- Active12
- Completed2
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.