Contractor · Electrical
John Tyler Crosby
15 building permits since 2023 in Arvin city, CA.
- Building permits
- 15
- Reported job value
- —
- Active
- 2023–2024
- Latest permit
- Mar 6, 2024
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Arvin city, CA15
Permits by year
By issue date (application date where there is none).
07.515
12
20232024
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 12 |
| 2024 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar8
- Battery storage8
- Electrical1
Permit types
As the building departments classify them.
- Arvin Building Permit15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 6, 2024 | Arvin Building Permit | SFR ROOF MOUNTED PV SYSTEM 9 PANELS, 3.203 KW AC TIE INTO NEW 125/125A PVL MAIN SERVICE PANEL and 1 ENPHASE ENCHARGE 5P BATTERY | Arvin City | — |
| Feb 6, 2024 | Arvin Building Permit | SFR ROOF MOUNTED PV SYSTEM, 12 PANELS, 4.271 KW AC with 1 ENPHASE ENCHARGE 10 KW BATTERY | Arvin City | — |
| Jan 10, 2024 | Arvin Building Permit | SFR ROOF MOUNTED PV SYSTEM, 19 PANELS, 7.505 KW DC/6.762 KW AC, (2) 10 KW ENPHASE ENCHARGE BATTERY-FULL BACK UP | Arvin City | — |
| Dec 27, 2023 | Arvin Building Permit | SFR ROOF MOUNTED PV SYSTEM, 15 PANELS, 5.925 KW DC with (1) 10 KW ENPHASE ENCHARGE BATTERY. | Arvin City | — |
| Nov 29, 2023 | Arvin Building Permit | SFR ROOFTOP PV SYSTEM, 11 Panels, 4.345 KW DC, 1 ENPHASE ENCHARGE 10 KW Battery. | Arvin City | — |
| Nov 29, 2023 | Arvin Building Permit | SFR ROOFTOP PV SYSTEM, 11 PANELS, 4.345 KW DC with 1 ENPHASE ENCHARGE 10KW BATTERY | Arvin City | — |
| Nov 29, 2023 | Arvin Building Permit | SFR ROOF MOUNTED PV SYSTEM, 11 PANELS, 4.345 KW DC WITH 1 ENPHASE ENCHARGE 10 KW BATTERY. TIEING INTO EXISTING SYSTEM. | Arvin City | — |
| Nov 16, 2023 | Arvin Building Permit | SFR ROOF MOUNTED PV, 12 MODULES, 4.740 KW DC WITH 1 ENPHASE ENCHARGE 10 KW BATTERY. | Arvin City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Active6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.