Contractor · General building
HOMETOWN BUILDERS AND CONSTRUCTION LLC
15 building permits since 2025 in Citrus County, FL and Crystal River city, FL — $1,610,000 in reported job value over 7 permits that state one.
- Building permits
- 15
- Reported job value
- $1.6M
- Active
- 2025–2026
- Latest permit
- Sep 1, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Citrus County, FL14
- Crystal River city, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 8 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- New construction10
- Roofing7
- Grading & excavation4
- Bathrooms4
- Remodels1
- Plumbing1
- Electrical1
- Windows & doors1
Permit types
As the building departments classify them.
- New Sfd7
- Residential3
- Amendment2
- Accessory Structure1
- Concrete1
- Res - Alteration/Repair1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 1, 2026 | Residential | New SFD ** NOC FOR NEW SFD IN OR BK 3671 PG 305 ** SITE PLAN APPROVED FOR SFD ONLY, 8 TREES MINIMUM TO BE RETAINED ON SITE. ** | Citrus County | — |
| Aug 13, 2026 | Residential | NEW SFD ** NOC FOR NEW SFD IN OR BK 3671 PG 307 ** SITE PLAN APPROVED FOR SFD ONLY, 5 TREES MINIMUM TO BE RETAINED ON SITE ** | Citrus County | — |
| Aug 4, 2026 | Concrete | POUR OPEN PATIO 20 X 40 AT REAR OF THE HOUSE AND SIDEWALK FROM DRIVEWAY TO NEW PATIO. **SITE APPROVED FOR 20X40 OPEN PATIO ON REAR OF HOME AND WALKWAY FROM BACK | Citrus County | — |
| Jul 15, 2026 | Res - Alteration/Repair | REPLACE DRYWALL, BRING ELECTRIC UP TO CODE, REPLACE WINDOWS, AND FLOORING. REPLACE PLUMBING. | Crystal River | — |
| Apr 22, 2026 | Accessory Structure | CONSTRUCTION OF A NEW 32 X 34 DETACHED GARAGE AND 14 X 32 ATTACHED CARPORT WITH 15 X 48 APRON IN REAR OF PROPERTY ** NOC (RECORDED) AND PRODUCT APPROVAL REQUIRE | Citrus County | — |
| Mar 6, 2026 | Residential | NEW SFD ** NOC FOR NEW SFD IN OR BK 3671 PG 303 ** SITE PLAN APPROVED FOR SFD ONLY, 5 TREES MINIMUM TO BE RETAINED ON SITE ** | Citrus County | — |
| Jan 16, 2026 | New Sfd | NEW SFD 3BR, 2BA, 2 CAR GARAGE. 2121 UNDER ROOF, 1462 LIVING *NOC FOR NEW CONSTRUCTION SFD IN OR BK 3588 PG 158* “SITE REVIEW APPROVED FOR SINGLE FAMILY RESIDEN | Citrus County | $230,000 |
| Oct 10, 2025 | New Sfd | NEW SFD 3BR,2BA, 2CAR GARAGE 2121 UNDER ROOF, 1462 LIVING  **NOC OR BK:3588 PG:159 FOR NEW CONSTRUCTION SFD. RECORDED NOC TO BE POSTED ON SITE.**&n | Citrus County | $230,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed12
- Issued3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.