Contractor · Electrical
DWAYNE JUDY
222 building permits since 2020 in Memphis city, TN; Shelby County, TN and Germantown city, TN.
- Building permits
- 222
- Reported job value
- —
- Active
- 2020–2024
- Latest permit
- Jun 25, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Memphis city, TN165
- Shelby County, TN28
- Germantown city, TN17
- Arlington town, TN6
- Lakeland city, TN5
- Millington city, TN1
Permits by year
By issue date (application date where there is none).
050100
86
20202021202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 3 |
| 2021 | 86 |
| 2022 | 85 |
| 2023 | 46 |
| 2024 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical222
- Demolition8
- Remodels4
- HVAC2
- Roofing1
- Additions1
- Fire sprinklers1
Permit types
As the building departments classify them.
- COMMERCIAL ELECTRICAL PERMIT222
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 25, 2024 | COMMERCIAL ELECTRICAL PERMIT | Install low voltage data cabling 1 application 1 building 1 floor | Memphis city | — |
| Jun 7, 2024 | COMMERCIAL ELECTRICAL PERMIT | Adding devices to an exist IO 1000 panel | Memphis city | — |
| Nov 2, 2023 | COMMERCIAL ELECTRICAL PERMIT | Pulling wire to add heat detectors and a smoke detector to the boiler room and elevator equipment room on the roof. | Memphis city | — |
| Sep 12, 2023 | COMMERCIAL ELECTRICAL PERMIT | We are installing a fire lite Panel and running wire to connect the hood system. | Memphis city | — |
| Sep 11, 2023 | COMMERCIAL ELECTRICAL PERMIT | adding to an existing fire alarm system. Installing devices and pulling wire. | Memphis city | — |
| Aug 16, 2023 | COMMERCIAL ELECTRICAL PERMIT | adding a strobe to the opposite side of the wall from existing device. | Memphis city | — |
| Aug 14, 2023 | COMMERCIAL ELECTRICAL PERMIT | Installing new fire alarm system and pulling the wire. | Memphis city | — |
| Aug 1, 2023 | COMMERCIAL ELECTRICAL PERMIT | Pulling wire and installing fire alarm equipment on a new system. | Memphis city | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.