Contractor · General building

hans dalhaus dalhaus

15 building permits since 2020 in 2501519370, MA.

Building permits
15
Reported job value
—
Active
2020–2025
Latest permit
Dec 4, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • 2501519370, MA15

Permits by year

By issue date (application date where there is none).

048
7
20202021202320242025
View as table
YearPermits
20202
20212
20231
20243
20257

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing6
  • Windows & doors5
  • Kitchens3
  • Demolition3
  • Electrical3
  • Additions2
  • Bathrooms2
  • Gas1
  • HVAC1
  • Grading & excavation1

Permit types

As the building departments classify them.

  • RESI.12
  • COMM.2
  • SIGN1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 4, 2025RESI.updating the existing kitchen with new cabinets and counter tops. eliminating a window to add a hood vent.Easthampton Town City—
Nov 25, 2025RESI.removing a wall between a living room and a dining room to add more space.Easthampton Town City—
Sep 30, 2025SIGNwe will be installing a new sign over the entry of the business. the sign will be 4 letters spelling "onda". the sign does not have its own lighting.Easthampton Town City—
Aug 13, 2025COMM.we will be adding two rooms to the existing space for cosmetic procedures. rooms will not be fully closed. we will be adding some electrical outlets and installEasthampton Town City—
Aug 5, 2025RESI.adding a 13x14 deck with attached 14x16 screened porch off the back of the house.Easthampton Town City—
May 16, 2025RESI.we are removing a prefab sunroom that has been leaking for years. we are building a 3 season room and a conditioned office space. we are adding to the existing Easthampton Town City—
Apr 29, 2025RESI.work includes the removal of existing rotted posts and porch entry framing. we will then install new new floor framing and posts and finish with trim and railinEasthampton Town City—
Dec 4, 2024RESI.we will be removing 9 first floor windows and 3 basement windows and replacing them with new paradigm new construction windows. new interior and exterior trim tEasthampton Town City—

Permit status

Where its permits stand, as the departments report them.

  • Issued7
  • Active4
  • Completed4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.