Contractor · Electrical
HAN M CHUNG
15 building permits since 2022 in Arlington County, VA.
- Building permits
- 15
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Apr 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Arlington County, VA15
Permits by year
By issue date (application date where there is none).
02.55
5
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 3 |
| 2024 | 5 |
| 2025 | 2 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- HVAC3
- Kitchens2
- Additions1
- Bathrooms1
- Plumbing1
- Heat pumps1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 16, 2026 | Electrical | East tower unit 1206, adding and relocating fixture electrical work, 2 smoke detectors, 6 switches, 6 light fixtures, 6 outlets, now the 6 outlets, 2 outlet is | Arlington County | — |
| Apr 14, 2026 | Electrical | east tower unit2108, adding and relocating 2 smoke detectors, 6switches, 6 light fixtures, 6 outlets, no new circuits, on that 6 outlets, relocate 2 outlets, ad | Arlington County | — |
| Nov 14, 2025 | Electrical | outlet and one spot light on a deck, deck install by general contractor(city light construction ,LLC) | Arlington County | — |
| May 16, 2025 | Electrical | add 3 new outlets and move forward about 24" the 4 light fixtures the building permit says in unit 800 or floor 8 | Arlington County | — |
| Oct 21, 2024 | Electrical | heavy up to 200amp, replace meterbase, panel box to 200amp rated service | Arlington County | — |
| Jul 2, 2024 | Electrical | relocate existing panel to different location in same business area | Arlington County | — |
| May 2, 2024 | Electrical | 5 recess lights, 2 flood lights on porch area | Arlington County | — |
| Mar 15, 2024 | Electrical | install new switch for disposal, dedicated circuit for panel microwave, gfi outlet for disposal and dishwasher, new outlet next to sink, install new outlet for | Arlington County | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.