Contractor · Other trades

Elders Charles

15 building permits since 2020 in Orleans Parish, LA.

Building permits
15
Reported job value
—
Active
2020–2026
Latest permit
Sep 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA15

Permits by year

By issue date (application date where there is none).

024
4
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20202
20212
20222
20234
20241
20252
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Windows & doors11
  • HVAC10
  • Plumbing8
  • Remodels6
  • Roofing5
  • Kitchens4
  • Additions1
  • Bathrooms1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)4

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 22, 2026—Exterior painting, roofing, mini split and drain line. Exterior new sewer line, no interior plumbing.Orleans Parish—
Aug 10, 2026—Roof Repair, Electrical Fixtures, A/C, Plumbing Repair, Floors, Doors, and Cabinets.Orleans Parish—
Nov 10, 2025—roofing, flooring, baseboards, interior paint, doors, central air conditioning, plumbing, electrical repair, attic insulationOrleans Parish—
Jul 21, 2025—Install four iron handrails, caulk porch cracks, adjust one exterior door and install attic ladder, update electrical, install new central air conditioning unitOrleans Parish—
Jun 9, 2024—Siding, Electric, Plumbing, HVAC, Insulation, Sheetrock, Baseboards, Cabinets, Paint Interior, Windows, and DoorsOrleans Parish—
Oct 23, 2023Renovation (Non-Structural)Roof Repair, Paint Interior and Exterior, install light fixtures, New CountertopsOrleans Parish—
Oct 1, 2023—Vacant commercial building to be use as storage only. Repairs include, electrical vacancy, baseboards, interior doors, paint, shelving, window panes, and removeOrleans Parish—
Jul 25, 2023—Sheetrock repair, Paint, Floors, Windows, Baseboards, Siding Repair, and Fence, and electrical. Permit extended (2) 180 day periods until January 25, 2025.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • C/o issued9
  • Finaled4
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.