Contractor · General building

EDWARD STYLE JR. PLUMBING AND GAS

15 building permits since 2022 in Howard County, MD.

Building permits
15
Reported job value
—
Active
2022–2026
Latest permit
Jul 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD15

Permits by year

By issue date (application date where there is none).

036
6
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20233
20244
20251
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing15
  • Kitchens11
  • Remodels11
  • Additions11
  • Bathrooms8
  • Gas5
  • Water heaters1

Permit types

As the building departments classify them.

  • Residential Plumbing Addition Alteration Permit11
  • Express Plumbing Permit3
  • Residential New Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 13, 2026Residential Plumbing Addition Alteration PermitSFD/Install new rough-in and trim out for basement washer/dryer and 2nd floor new washer/dryer. Reconstruct waste water and plumbing vents for kitchen and 2.5 bHoward County—
May 27, 2026Express Plumbing PermitReplace existing gas water heater located in the basement.Howard County—
Apr 13, 2026Express Plumbing PermitThis is a pull and replace kitchen. Installing new sink, faucet, dishwasher, refrigerator water line, and pot filler.Howard County—
Feb 23, 2026Residential Plumbing Addition Alteration PermitSFD/Reconstruct waste water and vents for new bathroom in addition (1-shower,1-toilet and 1-single vanity).Howard County—
Feb 6, 2026Residential Plumbing Addition Alteration PermitSFD/Reconstruct waste water and vents for new bathroom plumbing in new primary bathroom. Groundwork plumbing for utility sink in garage. Install rough-in plumbiHoward County—
Jan 14, 2026Residential Plumbing Addition Alteration PermitBasement groundwork plumbing to reconstruct waste water and vent to basement bathroom and wet bar. All in basement: vanity, shower, toilet, and wet bar sink.Howard County—
Jan 17, 2025Residential Plumbing Addition Alteration PermitReconstruct 1-kitchen sink, 1-disposal, 1-dishwasher, 1-refrigerator water line, and 1-pot filler.Howard County—
Dec 23, 2024Residential Plumbing Addition Alteration Permit1ST FLOOR INSTALL 1-KITCHEN FAUCET, 1-REFRIGERATOR WATER LINE, 1-DISHWASHER, 1-POT FILLER, BASEMENT - INSTALL 1-NEW FAUCET FOR WET BAR. and one 1/2 bathroom 1-THoward County—

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Issued4
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.