Contractor · General building
YODER HOMES, LLC
224 building permits since 2006 in Sarasota city, FL; North Port city, FL and Charlotte County, FL, across 2 counties — $36,907,433 in reported job value over 197 permits that state one.
- Building permits
- 224
- Reported job value
- $36.9M
- Active
- 2006–2026
- Latest permit
- Sep 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sarasota city, FL220
- North Port city, FL3
- Charlotte County, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2006 | 1 |
| 2007 | 5 |
| 2008 | 6 |
| 2009 | 11 |
| 2010 | 7 |
| 2011 | 14 |
| 2012 | 7 |
| 2013 | 22 |
| 2014 | 24 |
| 2015 | 10 |
| 2016 | 15 |
| 2017 | 11 |
| 2018 | 15 |
| 2019 | 7 |
| 2020 | 13 |
| 2021 | 14 |
| 2022 | 11 |
| 2023 | 7 |
| 2024 | 11 |
| 2025 | 9 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels78
- Bathrooms76
- Windows & doors55
- Kitchens52
- Electrical46
- Plumbing41
- New construction24
- HVAC23
- Demolition21
- Grading & excavation20
Permit types
As the building departments classify them.
- Building and Zoning212
- Engineering - Erosion and Siltation Control7
- Residential New2
- Building Revision1
- Over the Counter Permit1
- Residential Remodel1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 30, 2026 | Building and Zoning | New SFH and driveway. Separate ROW, ERO and Tree applications. | Sarasota City | $1,600,000 |
| Jun 1, 2026 | Building and Zoning | Removal of SFH and concrete driveway. Shell driveway to remain through proposed DEMO and proposed construction. Proposed removal of Three Trees (See site plan) | Sarasota City | $31,338 |
| Jun 1, 2026 | Engineering - Erosion and Siltation Control | ESC 4943 - Erosion control in conjunction with Proposed DEMO of SFH and Concrete Driveway. Separate Tree application to be submitted | Sarasota City | — |
| Apr 15, 2026 | Building and Zoning | Post Helene Flood Repair. Other contractor has repaired up to and including drywall, and Electric. Yoder Homes scope includes replacement of some base cabinetry | Sarasota City | $98,000 |
| Sep 16, 2025 | Building and Zoning | Interior Remodel, no change to footprint or space under air. New Impact windows and door. | Sarasota City | $347,000 |
| Jul 30, 2025 | Building Revision | New CNU SFH, concrete driveway and attached garage. Septic application already approved/issued | North Port City | $544,792 |
| Jul 24, 2025 | Building and Zoning | New SFH and driveway | Sarasota City | $676,800 |
| Jul 17, 2025 | Engineering - Erosion and Siltation Control | ESC 4314 - Erosion Protection BMP to include maintained silt Fence, wash down area with secondary silt fence, sod installation at end of proposed new SFH constr | Sarasota City | — |
Permit status
Where its permits stand, as the departments report them.
- Closed205
- Withdrawn10
- Issued3
- Reviews in progress2
- Pending1
- Cancelled1
- C/o issued1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.