Contractor · General building
Crosswater Development Company
15 building permits since 2024 in Tigard city, OR — $1,398,344 in reported job value over 5 permits that state one.
- Building permits
- 15
- Reported job value
- $1.4M
- Active
- 2024–2026
- Latest permit
- Oct 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tigard city, OR15
Permits by year
By issue date (application date where there is none).
048
8
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 6 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Grading & excavation5
- Accessory dwelling units3
- Additions3
- New construction3
- Demolition1
Permit types
As the building departments classify them.
- Erosion and Sediment Control - Residential3
- Stormwater Management - Private Stormwater Facilities3
- Address Request - Application2
- Residential New Dwelling Unit2
- Commercial Site Work1
- Erosion and Sediment Control - Commercial1
- Public Facility Improvement - Land Development1
- Residential Demolition1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 10, 2026 | Erosion and Sediment Control - Commercial | PFI2024-00409 Site Work Construction and Public Works improvements of 20 new cottages with private utilities to each along with paved parking lot and walkways. | Tigard | — |
| Oct 10, 2026 | Stormwater Management - Public Stormwater Facilities | Construction of new public curb & sidewalk, curb return and driveway along with storm planters on SW 93rd Ave & SW Edgewood St frontages. | Tigard | — |
| Oct 1, 2026 | Stormwater Management - Private Stormwater Facilities | Construction of 20 new cottages with private utilities to each along with paved parking lot and walkways. | Tigard | — |
| Sep 16, 2026 | Stormwater Management - Private Stormwater Facilities | Installation of a gravel infiltration trench to treat additional storm water created by a new addition to an existing SFR. | Tigard | $12,000 |
| Sep 10, 2026 | Erosion and Sediment Control - Residential | Addition to existing SFR + ADU. Erosion Control Measures include perimeter fence, covered topsoil storage, and paved driveway for access and material storage. S | Tigard | — |
| Sep 10, 2026 | Erosion and Sediment Control - Residential | Erosion Control Permit Request while constructing an addition to the SFR on the site. Measures include erosion control fencing, covered piles, and concrete cons | Tigard | — |
| Jul 1, 2026 | Stormwater Management - Private Stormwater Facilities | Requesting a Fee-In-Lieu of installing private storm water facility. | Tigard | $3,960 |
| May 18, 2026 | Erosion and Sediment Control - Residential | New Construction of Residence & ADU. Erosion Control Measures include perimeter fencing, covered topsoil pile storage, biobag filters at storm inlet vault, and | Tigard | — |
Permit status
Where its permits stand, as the departments report them.
- Pending payment8
- Issued2
- Void1
- Closed1
- Expired1
- Pending1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.