Contractor · General building

Crosswater Development Company

15 building permits since 2024 in Tigard city, OR — $1,398,344 in reported job value over 5 permits that state one.

Building permits
15
Reported job value
$1.4M
Active
2024–2026
Latest permit
Oct 10, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tigard city, OR15

Permits by year

By issue date (application date where there is none).

048
8
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
20256
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Grading & excavation5
  • Accessory dwelling units3
  • Additions3
  • New construction3
  • Demolition1

Permit types

As the building departments classify them.

  • Erosion and Sediment Control - Residential3
  • Stormwater Management - Private Stormwater Facilities3
  • Address Request - Application2
  • Residential New Dwelling Unit2
  • Commercial Site Work1
  • Erosion and Sediment Control - Commercial1
  • Public Facility Improvement - Land Development1
  • Residential Demolition1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 10, 2026Erosion and Sediment Control - CommercialPFI2024-00409 Site Work Construction and Public Works improvements of 20 new cottages with private utilities to each along with paved parking lot and walkways.Tigard—
Oct 10, 2026Stormwater Management - Public Stormwater FacilitiesConstruction of new public curb & sidewalk, curb return and driveway along with storm planters on SW 93rd Ave & SW Edgewood St frontages.Tigard—
Oct 1, 2026Stormwater Management - Private Stormwater FacilitiesConstruction of 20 new cottages with private utilities to each along with paved parking lot and walkways.Tigard—
Sep 16, 2026Stormwater Management - Private Stormwater FacilitiesInstallation of a gravel infiltration trench to treat additional storm water created by a new addition to an existing SFR.Tigard$12,000
Sep 10, 2026Erosion and Sediment Control - ResidentialAddition to existing SFR + ADU. Erosion Control Measures include perimeter fence, covered topsoil storage, and paved driveway for access and material storage. STigard—
Sep 10, 2026Erosion and Sediment Control - ResidentialErosion Control Permit Request while constructing an addition to the SFR on the site. Measures include erosion control fencing, covered piles, and concrete consTigard—
Jul 1, 2026Stormwater Management - Private Stormwater FacilitiesRequesting a Fee-In-Lieu of installing private storm water facility.Tigard$3,960
May 18, 2026Erosion and Sediment Control - ResidentialNew Construction of Residence & ADU. Erosion Control Measures include perimeter fencing, covered topsoil pile storage, biobag filters at storm inlet vault, and Tigard—

Permit status

Where its permits stand, as the departments report them.

  • Pending payment8
  • Issued2
  • Void1
  • Closed1
  • Expired1
  • Pending1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.