Contractor · Electrical

CALIFORNIA GREEN ENERGY CONSTRUCTION AND CONSULTING INC

15 building permits since 2019 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA — $450,206 in reported job value over 15 permits that state one.

Building permits
15
Reported job value
$450.2K
Active
2019–2024
Latest permit
Apr 18, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento city, CA8
  • Sacramento County, CA6
  • Elk Grove city, CA1

Permits by year

By issue date (application date where there is none).

02.55
5
20192021202220232024
View as table
YearPermits
20193
20212
20223
20235
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar12
  • Electrical9
  • Plumbing7
  • Water heaters7
  • Battery storage3
  • HVAC1
  • Generators1
  • Electric meters1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Single Family8
  • MISR5
  • ELECTRICAL1
  • SolarApp1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 18, 2024MISRTesla Powerwall2 emergency backup and battery essential load panel. Tesla Powerwall system comprised of 1 Tesla Powerwall2. 1 Tesla Gateway. 1 essential load baSacramento County$16,500
Dec 27, 2023Single FamilyInstall a 13.5 KWH Tesla Powerwall2 unit. Isolate essential load circuits and install an emergency backup load panel located in the garage alongside the Tesla gSacramento$16,400
Nov 1, 2023MISR22kw Generac standby generator and 200a rated automatic transfer switch with 100a rated AC safety disconnect switch and backup load panel. Generac SMM module foSacramento County$16,000
Jul 12, 2023Single FamilyAdding 13 new modules and optimizers to Existing system---NO!!! New inverters or other equiptment.4.745kw Solar PV System, and 0gal Solar WH System (water heateSacramento$15,000
Feb 21, 2023SolarAppSolarApp ID: SA20230221-2133-34-6485-A; 9.6 DC KW roof mounted and grid tied PV system. Solar system installed at a single family residence with with a detachedSacramento County$33,600
Feb 9, 2023MISRa 16.125 KW Solar System. 43 REC 375 panels. 2 SolarEdge 7,600 inverters.43 SolarEdge p401 power optimizers.XR100 Solar railing and attachment support systemSacramento County$46,000
Oct 27, 2022Single Family11.2kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will Sacramento$36,000
Jul 21, 2022MISR42 REC400 solar panels. 1 SE11,400H inverter. 42 SolarEdge power optimizers. Black Xr100 solar support system. Solar system installed on a single family residenSacramento County$52,570

Permit status

Where its permits stand, as the departments report them.

  • Issued8
  • Completed4
  • Closed2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.