15 building permits since 2019 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA — $450,206 in reported job value over 15 permits that state one.
- Building permits
- 15
- Reported job value
- $450.2K
- Active
- 2019–2024
- Latest permit
- Apr 18, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA8
- Sacramento County, CA6
- Elk Grove city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 3 |
| 2021 | 2 |
| 2022 | 3 |
| 2023 | 5 |
| 2024 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar12
- Electrical9
- Plumbing7
- Water heaters7
- Battery storage3
- HVAC1
- Generators1
- Electric meters1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Single Family8
- MISR5
- ELECTRICAL1
- SolarApp1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 18, 2024 | MISR | Tesla Powerwall2 emergency backup and battery essential load panel. Tesla Powerwall system comprised of 1 Tesla Powerwall2. 1 Tesla Gateway. 1 essential load ba | Sacramento County | $16,500 |
| Dec 27, 2023 | Single Family | Install a 13.5 KWH Tesla Powerwall2 unit. Isolate essential load circuits and install an emergency backup load panel located in the garage alongside the Tesla g | Sacramento | $16,400 |
| Nov 1, 2023 | MISR | 22kw Generac standby generator and 200a rated automatic transfer switch with 100a rated AC safety disconnect switch and backup load panel. Generac SMM module fo | Sacramento County | $16,000 |
| Jul 12, 2023 | Single Family | Adding 13 new modules and optimizers to Existing system---NO!!! New inverters or other equiptment.4.745kw Solar PV System, and 0gal Solar WH System (water heate | Sacramento | $15,000 |
| Feb 21, 2023 | SolarApp | SolarApp ID: SA20230221-2133-34-6485-A; 9.6 DC KW roof mounted and grid tied PV system. Solar system installed at a single family residence with with a detached | Sacramento County | $33,600 |
| Feb 9, 2023 | MISR | a 16.125 KW Solar System. 43 REC 375 panels. 2 SolarEdge 7,600 inverters.43 SolarEdge p401 power optimizers.XR100 Solar railing and attachment support system | Sacramento County | $46,000 |
| Oct 27, 2022 | Single Family | 11.2kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will | Sacramento | $36,000 |
| Jul 21, 2022 | MISR | 42 REC400 solar panels. 1 SE11,400H inverter. 42 SolarEdge power optimizers. Black Xr100 solar support system. Solar system installed on a single family residen | Sacramento County | $52,570 |
Permit status
Where its permits stand, as the departments report them.
- Issued8
- Completed4
- Closed2
- Additional information required1