Contractor · Specialty (solar, fire, telecom)
Blue Stream Communications LLC
15 building permits since 2026 in Charlotte County, FL.
- Building permits
- 15
- Reported job value
- —
- Active
- 2026
- Latest permit
- Sep 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Charlotte County, FL15
Type of work
Permits describing each kind of work; one permit can cover several.
- Telecom14
Permit types
As the building departments classify them.
- LD - ROW Utility-Internet15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 26, 2026 | LD - ROW Utility-Internet | Install 210 LF of (2) 1.5" HDPE Conduits w/fiber optic cable via directional bore, install 2 hand holes and 1 flower pot | Charlotte County | — |
| Sep 26, 2026 | LD - ROW Utility-Internet | Install 160 of (1) 1.5" HDPE Conduit w/fiber optic cable via directional bore, install 1 pedestal | Charlotte County | — |
| Sep 9, 2026 | LD - ROW Utility-Internet | This proposed work is to install 160 LF of (1) 1.5" HDPE Conduit w/fiber optic cable via directional bore, pull fiber through 500 LF of existing conduit, instal | Charlotte County | — |
| Jul 21, 2026 | LD - ROW Utility-Internet | This proposed project involves a directional bore construction to install 55 LF of (1) 1.5" HDPE Conduit w/fiber optic cable and install 1 flowerpot | Charlotte County | — |
| Jul 19, 2026 | LD - ROW Utility-Internet | This proposed job involves installation of 45 LF via directional bore construction and 25 LF via trench construction of (1) 1.5" HDPE conduits w/fiber optic cab | Charlotte County | — |
| Jul 19, 2026 | LD - ROW Utility-Internet | This proposed project involves the installation of 380 LF of (2) 1.5" HDPE conduits w/fiber cable via direction bore construction, and installation of 2 flowerp | Charlotte County | — |
| May 21, 2026 | LD - ROW Utility-Internet | Install 45 LF (1) 1.5" HDPE Conduit w/fiber optic cable via directional bore. Install 1570 LF of fiber optic cable via aerial. Install 5 LF (1) 1.5" HDPE Condui | Charlotte County | — |
| Apr 15, 2026 | LD - ROW Utility-Internet | Install 260 LF of (2) 1.5" HDPE conduits with fiber optic cable via directional bore and 3 flower pots. | Charlotte County | — |
Permit status
Where its permits stand, as the departments report them.
- Closed9
- Issued6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.