Contractor · Electrical

Blake Chisholm

15 building permits since 2022 in Cypress city, CA and Laguna Niguel city, CA — $197,589 in reported job value over 3 permits that state one.

Building permits
15
Reported job value
$197.6K
Active
2022–2026
Latest permit
Jun 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Cypress city, CA14
  • Laguna Niguel city, CA1

Permits by year

By issue date (application date where there is none).

02.55
5
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20225
20235
20241
20251
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar14
  • Battery storage7
  • Electrical7
  • EV chargers2

Permit types

As the building departments classify them.

  • Solar Residential Rooftop Permit11
  • SolarAPP+ Solar Permit2
  • Electrical1
  • Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 29, 2026SolarAPP+ Solar PermitInstallation of a 7.04 KW DC photovoltaic system consisting of 16 modules & 16 microinverters. Including (2) Enphase batteries (10 kwh each) & a new Enphase metCypress City$67,500
May 26, 2026Solar Residential Rooftop PermitInstallation of a 9.66 KW DC photovoltaic system consisting of 21 modules & 21 microinverters. Including (2) Enphase batteries (10 kwh each) & a new Enphase metCypress City$68,000
Mar 2, 2026ElectricalInstallation of a 8.36 kw dc photovoltaic system consisting of 19 modules & (1) tesla powerwall 3 battery (13.5 kwh). Including a new tesla backup switch. (submLaguna Niguel City—
Oct 13, 2025Solar Residential Rooftop PermitInstallation of (1) Tesla Powerwall 3 battery, new Tesla backup switch & a new 125A generation subpanel.Cypress City—
Jun 25, 2024SolarAPP+ Solar PermitInstallation of a 8.5 KW DC photovoltaic system consisting of 20 modules & 1 Tesla Powerwall 3. Including a new 125A backup subpanel & new Tesla backup gatewayCypress City$62,089
Nov 8, 2023Solar Residential Rooftop PermitInstallation of a 5.775 KW DC photovoltaic system consisting of 15 modules & 15 microinverters. Including a new Tesla gateway, new critical load center & (2) TeCypress City—
Apr 5, 2023Solar Residential Rooftop Permit10.0 KW DC. 25 modules & 25 microinverters. New derated 175A main breaker. New 50A/50A quad breaker for solarCypress City—
Mar 31, 2023Solar Residential Rooftop PermitInstallation of a 6.8 KW DC photovoltaic system consisting of 17 modules & 17 microinverters. Including a new upgraded main service panel 225A buss/200A mainCypress City—

Permit status

Where its permits stand, as the departments report them.

  • Completed12
  • Active3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.