Contractor · Plumbing
TODD RUSSO
226 building permits since 2011 in Buffalo city, NY and Clarence town, NY — $1,578,700 in reported job value over 209 permits that state one.
- Building permits
- 226
- Reported job value
- $1.6M
- Active
- 2011–2026
- Latest permit
- Jun 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY210
- Clarence town, NY16
Permits by year
By issue date (application date where there is none).
03060
58
20132017202020232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2011 | 1 |
| 2012 | 5 |
| 2013 | 2 |
| 2014 | 7 |
| 2016 | 4 |
| 2017 | 10 |
| 2018 | 18 |
| 2019 | 13 |
| 2020 | 12 |
| 2021 | 14 |
| 2022 | 6 |
| 2023 | 19 |
| 2024 | 33 |
| 2025 | 58 |
| 2026 (YTD) | 24 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing226
- Water heaters31
- Bathrooms15
- Kitchens13
- Gas4
- HVAC1
- Grading & excavation1
- Remodels1
- Roofing1
- Windows & doors1
Permit types
As the building departments classify them.
- PLUMBING210
- Plumbing (Conductor)5
- Plumbing (San Sew Repair)4
- Plumbing (Misc.)2
- Plumbing (Storm/Con Insp)2
- Plumbing (Water Heater)2
- Plumbing (Res. SGL R+R)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 30, 2026 | Plumbing (Storm/Con Insp) | Plumbing (Storm/Con Insp) | Clarence Town | $18,500 |
| Jun 22, 2026 | Plumbing (Storm/Con Insp) | Plumbing (Storm/Con Insp) | Clarence Town | $20,000 |
| Jun 11, 2026 | PLUMBING | Replace exterior lateral and house trap (up to main) | Buffalo City | $16,000 |
| Jun 10, 2026 | PLUMBING | We will cut out the existing cast-iron stack, cap off and concrete at the floor. We will then tie onto the stack coming down from the ceiling and hang it along | Buffalo City | $12,000 |
| Jun 8, 2026 | PLUMBING | On the inside of the home, we will cut and cap all downspout lines stack kitchen sink, stack line. We will then dig off the floor and remove the old toilet flan | Buffalo City | $13,000 |
| Jun 8, 2026 | PLUMBING | In the basement, we will cut the existing cast line right above the hub and a little bit farther than the PVC section repair that they have. We will then instal | Buffalo City | $1,775 |
| Jun 8, 2026 | PLUMBING | We will removed back pitched 2 inch and 3 inch lines, leaking fittings in basement. Tie into existing hung sewer with schedule 40 PVC 3. We will then tie into e | Buffalo City | $3,400 |
| Jun 7, 2026 | PLUMBING | Replacing sewer from house to sidewalk | Buffalo City | $11,500 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.