Contractor · Electrical
Aaron Hill
15 building permits since 2014 in North Andover town, MA; Rochester city, NH and Peabody city, MA, across 4 counties — $91,300 in reported job value over 14 permits that state one.
- Building permits
- 15
- Reported job value
- $91.3K
- Active
- 2014–2026
- Latest permit
- May 6, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- North Andover town, MA3
- Rochester city, NH3
- Peabody city, MA2
- Portsmouth city, NH2
- Boxford town, MA1
- Lexington town, MA1
- Derry town, NH1
- Exeter town, NH1
- Hampton town, NH1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2017 | 2 |
| 2021 | 2 |
| 2023 | 1 |
| 2025 | 5 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- HVAC2
- Remodels2
- Bathrooms2
- Heat pumps2
- Solar1
- Kitchens1
- Generators1
- Demolition1
- Water heaters1
Permit types
As the building departments classify them.
- Electrical4
- Electrical Permit4
- *Electrical Permit3
- Electrical Permit Application2
- Electrical Permit: Commercial2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 6, 2026 | Electrical Permit | remove (2) 100 amp feeds from 3 position meter enclosure, tie both 100 amp feeds into existing 200 amp main panel in basement to eliminate 2 of 3 meter positons | Rochester City | $1,000 |
| May 3, 2026 | Electrical Permit: Commercial | add 4 new fixtures in bathrooms, replace 18 fixtures 1 for 1, demo and rebuild low voltage for desk. replace any outlets not white in color. add up to 4 new sel | Portsmouth City | $10,000 |
| Mar 30, 2026 | Electrical Permit | Relocate electrical subpanel | Boxford Town | $5,000 |
| Sep 17, 2025 | Electrical Permit | Wire bathroom, lights in back hallway and hot water tank | Rochester City | $4,000 |
| Aug 20, 2025 | Electrical | 200 amp service upgrade | Derry Town | $4,500 |
| May 16, 2025 | Electrical Permit | Deenergize any existing devices and junction boxes covered by new framing, remove any unused romex thats accessible. Remove any new romex/boxes/lights installed | Rochester City | $9,000 |
| Apr 3, 2025 | Electrical | SERVICE | Exeter Town | $4,800 |
| Jan 27, 2025 | Electrical Permit: Commercial | 2 new circuits for mini splits, additional service outlet circuit if none existing | Portsmouth City | $4,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Active2
- Closed2
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.