Contractor · Electrical
WINDMAR SOLAR
16 building permits since 2025 in Polk County, FL; Sebring city, FL and North Port city, FL, across 5 counties — $229,163 in reported job value over 9 permits that state one.
- Building permits
- 16
- Reported job value
- $229.2K
- Active
- 2025–2026
- Latest permit
- Oct 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Polk County, FL5
- Sebring city, FL5
- North Port city, FL3
- Citrus County, FL2
- Charlotte County, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 4 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar9
- Battery storage6
- Electrical6
- Roofing4
- Additions1
Permit types
As the building departments classify them.
- Re-Roof Permit3
- Electric Permit2
- Res - Electric2
- Residential Solar2
- Res - Solar2
- Building Revision1
- Electrical1
- Residential Solar Photovoltaic1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2026 | Re-Roof Permit | REROOF REMOVE EXISTING SHINGLES AND REPLACE WITH NEW ARCHITECTURAL SHINGLES | Polk County | $19,773 |
| Oct 14, 2026 | Residential Solar Photovoltaic | Installation of grid-tied photovoltaic system + Main service panel upgrade | Charlotte County | $46,560 |
| Oct 12, 2026 | Electric Permit | POINCIANA NEIGHBORHOOD 4 VILLAGE 7 BLK 1068 LOT 7 | Polk County | $13,717 |
| Oct 12, 2026 | Electric Permit | INSTALLATION OF GRID-TIED BATTERY ENERGY STORAGE SYSTEM UTILITY: DUKE ENERGY | Polk County | $16,500 |
| Oct 2, 2026 | Re-Roof Permit | REROOF REMOVE EXISTING SHINGLES AND REPLACE WITH NEW ARCHITECTURAL SHINGLES | Polk County | $12,276 |
| Sep 24, 2026 | Re-Roof Permit | REROOF REMOVE EXISTING SHINGLES AND REPLACE WITH NEW ARCHITECTURAL SHINGLES | Polk County | $15,965 |
| Sep 14, 2026 | Electrical | INSTALLATION OF A NEW 200 A RATED BREAKER ENCLOSURE WITH A 200 A MAIN BREAKER **NOC OR BK:3699 PG:1611 FOR INSTALLATION OF GRID-TIED PHOTOVOLTAIC SYSTEM AND TES | Citrus County | — |
| Sep 14, 2026 | Solar | INSTALLATION OF GRID TIED ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM WITH TESLA ENERGY STORAGE SYSTEM AND MSP CHANGE/UPGRADE. / NOC ON FILE FOR INSTALLATION OF GRID | Citrus County | — |
Permit status
Where its permits stand, as the departments report them.
- Closed5
- Finaled5
- Issued2
- Active1
- Pending payment1
- Documents submitted1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.