Contractor · Electrical

THEISS ELECTRIC INC

16 building permits since 2018 in Marin County, CA; Novato city, CA and Sacramento city, CA, across 3 counties — $55,634 in reported job value over 13 permits that state one.

Building permits
16
Reported job value
$55.6K
Active
2018–2026
Latest permit
Mar 4, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marin County, CA11
  • Novato city, CA2
  • Sacramento city, CA2
  • Santa Rosa city, CA1

Permits by year

By issue date (application date where there is none).

024
4
2019202220242026*
* 2026 is year to date.
View as table
YearPermits
20181
20194
20201
20221
20232
20243
20251
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • Gas5
  • Electric meters5
  • Pools & hot tubs3
  • Additions1
  • Plumbing1
  • EV chargers1
  • Water heaters1

Permit types

As the building departments classify them.

  • RESIDENTIAL11
  • Electrical3
  • Apts 3-41
  • Single Family1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 4, 2026ElectricalReplace main panel like for like. There are no gas clearance issues here.Novato City—
Mar 3, 2026ElectricalReplace main panel with like for like, no gas clearance issuesNovato City—
Jan 16, 2026ElectricalRemove old 100 amp zinsco style panel and replace with new 200 amp meter main panelSanta Rosa City—
Jan 6, 2025RESIDENTIALremove existing 100Amp panel and upgrade it to a 200Amp new panel.Marin County$3,800
Sep 30, 2024Apts 3-4We will be removing (2) Fuse Panel in the interior of unit A. We will be removing (4) exterior 60Amp Zinsco style sub panels and replacing them with a "Like forSacramento$13,080
Sep 9, 2024Single FamilyWe will be removing existing panels on the back of the buildings (not viewable from the street) with LIKE for LIKE. Each panel is going to be in the same size. Sacramento$2,300
Jun 20, 2024RESIDENTIALWe will be mounting a new 200amp panel approximately 3 inches to the left of the existing 100Amp panel. This will be a surface mount. we will then use the old pMarin County$4,100
Mar 27, 2023RESIDENTIALWe will be changing a main panel. Scope of Work: Install a new panel 36 away from the old panel and gas. Install new weather head, and main wire feeds. relocateMarin County$3,800

Permit status

Where its permits stand, as the departments report them.

  • Not stated11
  • Active3
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.