Contractor · Specialty (solar, fire, telecom)

SKY COUNTRY CONSTRUCTION

16 building permits since 2021 in Riverside city, CA; Los Angeles city, CA and Redlands city, CA, across 3 counties — $194,677 in reported job value over 7 permits that state one.

Building permits
16
Reported job value
$194.7K
Active
2021–2023
Latest permit
Apr 12, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Riverside city, CA7
  • Los Angeles city, CA6
  • Redlands city, CA3

Permits by year

By issue date (application date where there is none).

048
7
202120222023
View as table
YearPermits
20217
20226
20231

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar13
  • Electrical9
  • Roofing7
  • Battery storage3

Permit types

As the building departments classify them.

  • Residential7
  • Electrical6
  • B-BSP Solar3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 12, 2023ResidentialINSTALL PV SYSTEM ON RESIDENTIAL ROOF: 14 PANELS & 4.9KW 8/06/24: REVISION: 4.480 KW - MSRiverside City$15,000
May 24, 2022ResidentialINSTALL PV SOLAR SYSTEM WITH (29) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 11.31 KW **PANEL UPGRADE TO BE ON SEPARATE PERMIT**Riverside City$25,169
May 4, 2022ResidentialINSTALL RESIDENTIAL ROOFTOP PV SYSTEM WITH (26) PANELS AND 10.4KWRiverside City$36,400
Mar 2, 2022B-BSP SolarResidential: Install Roof-top PV System, 5.280kW, 12 modulesRedlands City—
Feb 3, 2022B-BSP SolarRESIDENTIAL" (N) 3.2kwdc PV SOLAR (ROOF MOUNTED), (8) MODULES, (N) BATTERY BACK-UP SYSTEMRedlands City—
Jan 28, 2022B-BSP SolarRESIDENTIAL : ROOF MOUNT PV SOLAR (26) MODULES (26) MI'S 10.4 KW . NO MPU NO BATTERYRedlands City—
Jan 14, 2022Electrical—Los Angeles City—
Dec 29, 2021ResidentialINSTALL PV SOLAR SYSTEM WITH (30) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 12 KW MAIN ELECTRIC SERVICE PANEL DERATEDRiverside City$34,802

Permit status

Where its permits stand, as the departments report them.

  • Not stated6
  • Completed5
  • Issued2
  • Expired2
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.