Contractor · Specialty (solar, fire, telecom)
RT MAHER CONSTRUCTION
16 building permits since 2018 in Madera city, CA; Merced city, CA and Tuolumne County, CA, across 3 counties — $325,150 in reported job value over 13 permits that state one.
- Building permits
- 16
- Reported job value
- $325.2K
- Active
- 2018–2026
- Latest permit
- May 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Madera city, CA11
- Merced city, CA4
- Tuolumne County, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 3 |
| 2022 | 4 |
| 2023 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar14
- Battery storage3
- HVAC2
- Roofing2
- Plumbing2
- Electrical1
- Windows & doors1
- Electric meters1
Permit types
As the building departments classify them.
- RESPVSOLAR4
- Solar3
- RESPV P/C2
- ADDENDUM/C1
- Electrical1
- SOLAR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 8, 2026 | Solar | Install a 4.07 kW DC solar system with battery storage. PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION - DO NOT COVER MECHANICAL OR PLUMBING VEN | Merced City | $25,300 |
| Sep 29, 2025 | Solar | Install 7.5kW DC roof mount solar system with 13.5kWh battery | Merced City | $37,650 |
| Aug 14, 2025 | Solar | Installing 18 - REC SOLAR REC410AAPURE-R (410W) MODULES - 7.380 KW - 01 TESLA POWERWALL 3 (1707000-XX-Y) INTEGRATED SOLAR+BATTERY. PHOTOVOLTAIC CONTRACTOR SHALL | Merced City | $38,900 |
| Jun 11, 2025 | Electrical | panel upgrade/replacement. Changing the existing 200amp meter and splitting into (2) 100amp meters | Merced City | $1,500 |
| Apr 27, 2023 | SOLAR | SOLAR | Tuolumne County | $23,800 |
| Sep 12, 2022 | RESPVSOLAR | PV SOLAR POWER SYSTEM / 3.80 KW | Madera City | $14,800 |
| Aug 24, 2022 | RESPV P/C | PV SOLAR POWER SYSTEM - 3.800 KW P/C EXPRESS | Madera City | $14,800 |
| Jul 19, 2022 | RESPVSOLAR | PV SOLAR POWER SYSTEM / 7.8KW | Madera City | $23,900 |
Permit status
Where its permits stand, as the departments report them.
- Issued9
- Completed6
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.