Contractor · General building
Roco Electrical Services
16 building permits since 2018 in Gaston County, NC — $2,069,096 in reported job value over 12 permits that state one.
- Building permits
- 16
- Reported job value
- $2.1M
- Active
- 2018–2026
- Latest permit
- Apr 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gaston County, NC16
Permits by year
By issue date (application date where there is none).
024
4
2018202020242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 1 |
| 2020 | 2 |
| 2023 | 3 |
| 2024 | 4 |
| 2025 | 4 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels7
- New construction6
- Electrical5
- HVAC2
- Roofing2
- Generators2
- Kitchens1
- Plumbing1
- Windows & doors1
Permit types
As the building departments classify them.
- Alteration / Remodel (Residential)7
- New Single-Family Home (Residential)3
- Single Trade (Residential) - Electrical3
- ZN - New Construction – Single Family Residential3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 10, 2026 | Alteration / Remodel (Residential) | Fire damage repairs to home. Like for like replacement. Kitchen fire. | Gaston County | $179,740 |
| Dec 19, 2025 | Single Trade (Residential) - Electrical | BLDR-25-10-10-19241 wiring detached garage BL:DR-25-10-10-19241 | Gaston County | — |
| Apr 29, 2025 | Alteration / Remodel (Residential) | Tree damage repair. Like for like repairs. Rafter repair, roof replacement, insulation, drywall, trim, etc. Water damage occurred from roof penetrations. | Gaston County | $91,000 |
| Apr 10, 2025 | Alteration / Remodel (Residential) | Fire damage repairs. Like for like replacement of fire damaged materials and finishes. Roof replacement, hvac, electrical, and interior finish replacement. | Gaston County | $262,000 |
| Jan 13, 2025 | ZN - New Construction – Single Family Residential | new construction single family residence *Must obtain a Gaston County building permit prior to starting construction activities * A foundation survey must be on | Gaston County | — |
| Sep 20, 2024 | ZN - New Construction – Single Family Residential | 1244 Plan ‘Must obtain building permit from Gaston County prior to start of construction’. **Foundation Survey must be on file and approved prior to the Framing | Gaston County | $100,000 |
| Sep 19, 2024 | New Single-Family Home (Residential) | 1244 Plan | Gaston County | $222,526 |
| Apr 25, 2024 | ZN - New Construction – Single Family Residential | New single family home ‘Must obtain building permit from Gaston County prior to start of construction’. **Must stay out of Powerline/Utility Right of Way** **Fo | Gaston County | $150,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed13
- Void1
- Issued1
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.