Contractor · General building

GC Assumes Responsibility for Subcontracted Work

1,960 building permits since 2012 in Boulder city, CO — $108,963,351 in reported job value over 1,918 permits that state one.

Building permits
1,960
Reported job value
$109M
Active
2012–2025
Latest permit
Jun 6, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO2K

Permits by year

By issue date (application date where there is none).

05001K
838
20132016201920222025
View as table
YearPermits
20127
201310
20149
201540
201647
201791
2018838
2019436
2020250
2021159
202259
20235
20243
20256

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels1.1K
  • Electrical1.1K
  • Bathrooms850
  • Plumbing803
  • HVAC760
  • Kitchens493
  • Additions411
  • Windows & doors297
  • New construction192
  • Demolition121

Permit types

As the building departments classify them.

  • Electrical Permit928
  • Plumbing Permit515
  • Mechanical Permit504
  • Utility Permit12
  • Demolition Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 6, 2025Electrical PermitVOID- 180 Days no activity Building A at Velo Park: Construction of a multifamily building with 12 residential units (12,289 sqft), 11 garage spaces (4836 sqft)Boulder$121,629
Jun 6, 2025Electrical PermitVOID- 180 Days no activity Building B at Velo Park: Construction of a multifamily building with 18 residential units (20,148 sqft) and 13 garage spaces (5,343 sBoulder$194,283
Jun 6, 2025Mechanical PermitVOID- 180 Days no activity Building A at Velo Park: Construction of a multifamily building with 12 residential units (12,289 sqft), 11 garage spaces (4836 sqft)Boulder$88,213
Jun 6, 2025Mechanical PermitVOID- 180 Days no activity Building B at Velo Park: Construction of a multifamily building with 18 residential units (20,148 sqft) and 13 garage spaces (5,343 sBoulder$132,320
Jun 6, 2025Plumbing PermitVOID- 180 Days no activity Building A at Velo Park: Construction of a multifamily building with 12 residential units (12,289 sqft), 11 garage spaces (4836 sqft)Boulder$202,596
Jun 6, 2025Plumbing PermitVOID- 180 Days no activityBuilding B at Velo Park: Construction of a multifamily building with 18 residential units (20,148 sqft) and 13 garage spaces (5,343 sqBoulder$312,894
May 8, 2024Electrical Permit**Related to WCF2023-00006, ADR2023-00126, and ADR2023-00127.** DISH Wireless is installing new telecommunications equipment and antennas on the existing roof oBoulder$10,000
Jan 15, 2024Electrical Permit*Voided for inactivity - no inspections within 180 days* Interior, non-structural tenant remodel for BOK Financial. Rearranging partition walls, relocating exisBoulder$9,000

Permit status

Where its permits stand, as the departments report them.

  • Closed1.6K
  • Void302
  • Completed59
  • Withdrawn23
  • Issued22
  • Documents submitted1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.