Contractor · Specialty (solar, fire, telecom)
POWUR PBC DBA POWUR HOME CONSTRUCTION
16 building permits since 2023 in San Diego County, CA; Temecula city, CA and Anaheim city, CA, across 4 counties — $20,800 in reported job value over 1 permits that state one.
- Building permits
- 16
- Reported job value
- $20.8K
- Active
- 2023–2026
- Latest permit
- Jun 3, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- San Diego County, CA7
- Temecula city, CA7
- Anaheim city, CA1
- Madera city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 11 |
| 2024 | 4 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar11
- Electrical6
- Battery storage3
Permit types
As the building departments classify them.
- BLDG - Building (R)5
- BLDG - Building (R) Issued1
- BLDG - Electrical (R)1
- RESPVSOLAR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 3, 2026 | BLDG - Building (R) Issued | Online SolarApp+/21 modules/21{240V} microinverters/2 IQBATTERY/System Size: 9.66 kW DC (7.96 kW AC) - Stadlman Residence | Temecula City | — |
| Nov 6, 2024 | BLDG - Building (R) | Online. Solar App+. 25 panels 10.3 kW, 27 kwh ESS, new 125A sub. Costantino residence | Temecula City | — |
| Aug 20, 2024 | BLDG - Building (R) | Online Roof Mount Solar/ 14.4kw/27kWh/34 panels - Riley Residence | Temecula City | — |
| Jun 18, 2024 | — | Photovoltaic System: Install Residential Roof Mounted Solar System With (32) Modules, (2) Inverters, 225amp Subpanel, 125amp Load Center And (3) Ess. | Anaheim City | — |
| Apr 1, 2024 | BLDG - Building (R) | Online / Roof mounted PV 13.36kW / 33 modules / 1 inverter / 3 batteries / Add on to existing system / Alcala residence | Temecula City | — |
| Nov 8, 2023 | RESPVSOLAR | PV SOLAR POWER SYSTEM / 10.40 KW DC | Madera City | $20,800 |
| Sep 1, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures fr | San Diego County | — |
| Aug 30, 2023 | — | ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE | San Diego County | — |
Permit status
Where its permits stand, as the departments report them.
- Issued6
- Active4
- Not stated3
- Pending1
- Reviews in progress1
- Additional information required1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.