16 building permits since 2024 in Mesa city, AZ — $16,450 in reported job value over 15 permits that state one.
- Building permits
- 16
- Reported job value
- $16.5K
- Active
- 2024–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ16
Permits by year
By issue date (application date where there is none).
036
6
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 6 |
| 2025 | 3 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing16
- Gas14
- Pools & hot tubs11
Permit types
As the building departments classify them.
- Plumbing16
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Plumbing | INSTALLATION OF 125-FT OF 1.5-IN PE GAS LINE BURIED 18-IN WITH 14-GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES ARE TO BE INSTALLED PE | Mesa | $1,300 |
| Aug 12, 2026 | Plumbing | Installation of 113-ft of 1.5-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed pe | Mesa | $1,200 |
| Apr 28, 2026 | Plumbing | INSTALL 500-GAL U/G LP TANK WITH CATHODIC PROTECTION AND TWO STAGE REGULATOR (SEE SPEC SHEET). *NO IGNITION, P/L, OR STRUCTURE WITHIN 10 FT.* 40 FT OF 1" P.E. W | Mesa | $1,400 |
| Apr 27, 2026 | Plumbing | Installation of 88-ft of 1-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 75K BTU pool firepit, 20-ft of 1-in PE gas line to 50K BTU BB | Mesa | $1,100 |
| Mar 27, 2026 | Plumbing | Installation of 65-ft of 2-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 400K BTU pool heater, 7-ft of .75-in PE gas line to 75K BTU f | Mesa | $900 |
| Feb 26, 2026 | Plumbing | INSTALL TWO 120-GAL LP ABOVE GROUND LP TANKS ON MOLDED PLASTIC SLAB. NO IGNITION WITHING 10 FT, NO OPENINGS WITHIN 5 FT. 20 FT OF 1-IN GALVANIZED PIPING TO BE S | Mesa | $650 |
| Dec 8, 2025 | Plumbing | Installation of 90-ft of 1.5-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per | Mesa | $1,000 |
| Dec 3, 2025 | Plumbing | Install gas line from natural gas meter 80 ft of 1-1/2-inch P.E. to pool heater (400k BTU), T-off 45 ft of 1-inch P.E. to stub out for future BBQ (25k BTU) and | Mesa | $800 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued14
- Issued1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.