Contractor · Electrical
NEW HORIZONS TECHNOLOGIES
16 building permits since 2005 in Lynnfield town, MA; Dartmouth town, MA and Rockland town, MA, across 8 counties — $504,000 in reported job value over 7 permits that state one.
- Building permits
- 16
- Reported job value
- $504K
- Active
- 2005–2023
- Latest permit
- Apr 3, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lynnfield town, MA3
- Dartmouth town, MA2
- Rockland town, MA2
- Exeter town, NH2
- Chicopee city, MA1
- Westford town, MA1
- Brookline town, MA1
- Foxborough town, MA1
- Medway town, MA1
- Derry town, NH1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2005 | 1 |
| 2013 | 2 |
| 2015 | 1 |
| 2020 | 3 |
| 2021 | 2 |
| 2022 | 4 |
| 2023 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical13
- HVAC2
- Kitchens2
- New construction2
- Remodels1
- Windows & doors1
- Electric meters1
Permit types
As the building departments classify them.
- ELECT.4
- Electrical3
- Other3
- Electrical Permit2
- Commercial Electrical1
- Electrical Wiring1
- Munis Permit1
- Residential Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 3, 2023 | Electrical Permit | — | Westford Town | — |
| Dec 1, 2022 | Electrical Wiring | Remove disconnects and quad outlet from Kitchen wall beside hood exhaust fan for FRP removal and replacement. Re-install disconnects when FRP is complete. NO ad | Dover City | $6,000 |
| Aug 29, 2022 | ELECT. | disconnected faulty motor, reconnected new motor. replaced the existing 30 amp 2 pole smart breakers with new 30 amp 2 pole smart breakers. | Rockland Town | $400 |
| Aug 26, 2022 | ELECT. | the wendy's restaurant was shut down from a tripped duct smoke. the fire marshal requires us to pull a permit and inspect the electrical system to make sure the | Rockland Town | $400 |
| Aug 2, 2022 | Commercial Electrical | TACO BELL restaurant , Replace lighting, signage, add Electrical panels and 400 amp meter socket, wire cooking equipment, install kitchen outlets. | Brookline Town | — |
| Jan 27, 2021 | ELECT. | Installation of (98) Category 6 data drops from existing Draft King IDF to new SEZ concession area. Terminate, label, and test. | Foxborough Town | — |
| Jan 27, 2021 | Electrical | Add Donut shop to existing gas station | Derry Town | $38,500 |
| Dec 28, 2020 | Electrical Permit | — | Dartmouth Town | $3,700 |
Permit status
Where its permits stand, as the departments report them.
- Issued7
- Closed5
- Completed2
- Expired1
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.