Contractor · Electrical

Michael Dolan

16 building permits since 2012 in Providence city, RI; Lakeville town, MA and Middletown town, RI, across 5 counties — $295,930 in reported job value over 16 permits that state one.

Building permits
16
Reported job value
$295.9K
Active
2012–2026
Latest permit
Aug 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI7
  • Lakeville town, MA2
  • Middletown town, RI2
  • Bridgewater Town city, MA1
  • Boston city, MA1
  • Warwick city, RI1
  • Newport city, RI1
  • Pawtucket city, RI1

Permits by year

By issue date (application date where there is none).

02.55
5
2016201920242026*
* 2026 is year to date.
View as table
YearPermits
20121
20161
20185
20191
20201
20243
20252
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical8
  • Telecom5
  • Accessory dwelling units2
  • Electric meters2
  • HVAC1
  • Additions1
  • Windows & doors1
  • New construction1

Permit types

As the building departments classify them.

  • Building Permit7
  • Electrical Permit7
  • ELECTRICAL1
  • RESI.1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 21, 2026Building PermitBuilding an 8x10 shed in the backyard.Pawtucket City$5,000
Jan 23, 2026Electrical Permitrough and finish wire addition, upgrade existing service from 100 amp to 200 amp add 100 amp sub panel in new addition area.Warwick City$100,000
Apr 7, 2025Electrical Permitremove meter socket for new siding to get installed, install meter socket back to house when siding is completedLakeville Town$350
Feb 5, 2025Electrical Permitfinish the electrical job, install switches , plugs and some fixturesLakeville Town$750
Aug 23, 2024Electrical PermitRough electrical work for ADU associated with 9 beechlandMiddletown Town$2,000
Aug 23, 2024Electrical PermitNew service for ADU 400 amps 200 to existing house 200 to new ADUMiddletown Town$13,000
May 9, 2024Electrical Permitdisconnect ran from main panel across basement to disconnect in compliance with NEC code. HVAC 2 9,000 btu units. 30 amp outdoor 240 disconnect to be installed Newport City$2,000
Jun 10, 2020Electrical Permitupgrade 100 amp overhead single meter(120/240 volt single phase) service to a 200 amp ( 120/240 volt single phase) service. Point of attachment remains the sameProvidence City$1,500

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Active3
  • Closed1
  • Approved1
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.