Contractor · Electrical

MICAH ELECTRIC CO.

16 building permits since 2026 in Oakland city, CA; Berkeley city, CA and Alameda city, CA.

Building permits
16
Reported job value
—
Active
2026
Latest permit
Feb 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Oakland city, CA11
  • Berkeley city, CA3
  • Alameda city, CA1
  • San Leandro city, CA1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • EV chargers4
  • Bathrooms2
  • HVAC1
  • Solar1
  • Kitchens1
  • Plumbing1
  • Water heaters1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical16

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 26, 2026ElectricalMain panel. Replace subpanel, 90 amps install dryer outlet and washer outlet 1) 3 meter main panel 150 amp capacity. Unit main to be upgraded from 60 amps to 90San Leandro City—
Feb 23, 2026ElectricalReplace main panel (200 amps) like for like; replace 2 subpanels (units 3 and 4)Oakland City—
Feb 23, 2026ElectricalChanging from 100 to 200 amps; no added load; no added solarOakland City—
Feb 19, 2026ElectricalRemove and replace all knob and tube throughout homeOakland City—
Feb 13, 2026ElectricalUpgrade msp panel from 100 to 200 amps. Add 60 amp subpanel. Remove and replace all knob and tube throughout home. Add ev chargerOakland City—
Feb 11, 2026ElectricalUpgrade main panel from 100 amps to 200 amps. Remove and replace sub panel. Remove and replace all knob and tube wiring in home in existing locations.Oakland City—
Feb 5, 2026ElectricalRemove and replace existing zinsco sub panel with new in same location.Oakland City—
Jan 29, 2026ElectricalReplace and install main panel 125a service. Replace and install 125a sub panel, install new car charger and 2 gfci's in garage (same location)Berkeley City—

Permit status

Where its permits stand, as the departments report them.

  • Active10
  • Finaled6

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.