Contractor · Electrical

John Felbinger

16 building permits since 2021 in Valley Stream village, NY and Freeport village, NY — $1,500 in reported job value over 1 permits that state one.

Building permits
16
Reported job value
$1.5K
Active
2021–2026
Latest permit
Jul 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Valley Stream village, NY15
  • Freeport village, NY1

Permits by year

By issue date (application date where there is none).

048
8
20212022202420252026*
* 2026 is year to date.
View as table
YearPermits
20211
20221
20244
20258
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • EV chargers10
  • HVAC1
  • Solar1
  • Battery storage1
  • Remodels1
  • Heat pumps1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical Permit Application15
  • Electric Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 22, 2026Electric PermitMaintain existing solar installation performed by others. Work will be done with Marcor Solar and attached to their solar permit. They are currently filing and Freeport Village$1,500
May 20, 2026Electrical Permit ApplicationInstall 4 Ring Security Cameras using surface mounted conduit along perimeter of structure towards the topValley Stream Village—
Nov 12, 2025Electrical Permit ApplicationInstall 60-amp 240v dedicated circuit for EV Charger. Charger mounted on exterior wall of garage - driveway sideValley Stream Village—
Sep 22, 2025Electrical Permit ApplicationInstall 60-amp 240v dedicated circuit for hardwired level 2 residential EV charging stationValley Stream Village—
May 6, 2025Electrical Permit ApplicationInstall 60-amp dedicated circuit for Ford EV charging station protected by a 50-amp overload device. The charger will be installed on the exterior wall of the hValley Stream Village—
May 6, 2025Electrical Permit ApplicationInstall 60-amp 240v dedicated circuit for level 2 EV charging station mounted on exterior wall of house - driveway side.Valley Stream Village—
Apr 29, 2025Electrical Permit ApplicationUpgrade existing 100-amp service to 200-amps. Upgrade existing 100-amp panel to new 200-amp panel. Install customer's EV charging station on 60-amp dedicated ciValley Stream Village—
Mar 5, 2025Electrical Permit ApplicationInstall customer furnished electric vehicle service equipment with new 60amp 240v dedicated circuit protected by 60amp overload device. The charger will be mounValley Stream Village—

Permit status

Where its permits stand, as the departments report them.

  • Active8
  • Completed8

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.