Contractor · HVAC
J & M HEATING & AIR CONDITIONING
16 building permits since 2005 in Bronx County, NY and New York County, NY, across 2 counties — $3,421,800 in reported job value over 16 permits that state one.
- Building permits
- 16
- Reported job value
- $3.4M
- Active
- 2005–2010
- Latest permit
- Jun 29, 2010
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Bronx County, NY12
- New York County, NY4
Permits by year
By issue date (application date where there is none).
036
6
20052006200820092010
View as tableHide table
| Year | Permits |
|---|---|
| 2005 | 4 |
| 2006 | 2 |
| 2008 | 2 |
| 2009 | 6 |
| 2010 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC10
- Plumbing4
- Remodels2
Permit types
As the building departments classify them.
- MH9
- OT7
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 29, 2010 | MH | HEREWITH FILING INSTALLATION OF FIVE (5) WATER COOLED AIR CONDITIONING UNITS AND MINOR INTERIOR WORKS FOR ALBERT EINSTEIN COLLEGE OF MEDICINE AS PER PLANS ATTAC | Bronx County | $112,000 |
| Jun 29, 2010 | OT | HEREWITH FILING INSTALLATION OF FIVE (5) WATER COOLED AIR CONDITIONING UNITS AND MINOR INTERIOR WORKS FOR ALBERT EINSTEIN COLLEGE OF MEDICINE AS PER PLANS ATTAC | Bronx County | $112,000 |
| Jul 31, 2009 | MH | MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | Bronx County | $402,400 |
| Jul 31, 2009 | MH | MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | Bronx County | $402,400 |
| May 21, 2009 | MH | HEREWITH FILING MECHANICAL PLANS FOR UNDERGOUUND CHILLED WATER PIPING AND ASSOCIATED WORKS TO MAZER BUILDING AS PER PLANS ATTACHED. NO CHANGE TO USE, EGRESS OR | Bronx County | $320,000 |
| May 21, 2009 | MH | HEREWITH FILING MECHANICAL PLANS FOR UNDERGOUUND CHILLED WATER PIPING AND ASSOCIATED WORKS TO MAZER BUILDING AS PER PLANS ATTACHED. NO CHANGE TO USE, EGRESS OR | Bronx County | $320,000 |
| May 21, 2009 | OT | HEREWITH FILING CIVIL ENGINEERING PLANS FOR UNDERGROUND CHILLED WATER PIPING AND ASSOCIATED WORKS TO MAZER BUILDING AS PER PLANS ATTACHED. NO CHANGE TO USE, EGR | Bronx County | $70,000 |
| May 21, 2009 | OT | HEREWITH FILING CIVIL ENGINEERING PLANS FOR UNDERGROUND CHILLED WATER PIPING AND ASSOCIATED WORKS TO MAZER BUILDING AS PER PLANS ATTACHED. NO CHANGE TO USE, EGR | Bronx County | $70,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.