Contractor · Electrical
E.W.E Electric/Cape Fear Generators DBA
232 building permits since 2019 in Pender County, NC; Burgaw town, NC and St. Helena village, NC — $1,119,074 in reported job value over 91 permits that state one.
- Building permits
- 232
- Reported job value
- $1.1M
- Active
- 2019–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Pender County, NC222
- Burgaw town, NC6
- St. Helena village, NC4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 11 |
| 2020 | 31 |
| 2021 | 25 |
| 2022 | 29 |
| 2023 | 33 |
| 2024 | 50 |
| 2025 | 32 |
| 2026 (YTD) | 21 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators210
- Electrical164
- Gas119
- Plumbing118
- Electric meters5
- Pools & hot tubs5
- HVAC3
- Heat pumps2
- Solar1
- Water heaters1
Permit types
As the building departments classify them.
- Residential Electrical Stand Alone Permit111
- Residential Gas Piping Stand Alone Permit89
- Residential Gas Piping Generator Installation Permit24
- Commercial Electrical Stand Alone Permit5
- Commercial Gas Piping Stand Alone Permit2
- Residential Accessory1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Residential Gas Piping Generator Installation Permit | Install (1) 24kw Generac Generator. Install approx. 10'-15' of Electrical Feed from Generator to Automatic Transfer Switch. Install 30amp Electrical Feed from W | Pender County | — |
| Oct 14, 2026 | Residential Gas Piping Generator Installation Permit | Install One 26kw Generac Generator. Utilize (2) Two Existing 200amp Automatic Transfer Switches. Install Approx. 5' of Electrical Feed from Generator to Junctio | Pender County | — |
| Oct 13, 2026 | Residential Gas Piping Generator Installation Permit | Turnkey Change Out Remove Existing Generator & Haul Away. Install One 22kw Generac Air Cooled Generator. Utilize Existing 200amp Automatic Transfer Switch. Util | Pender County | — |
| Sep 29, 2026 | Residential Gas Piping Generator Installation Permit | Install (1) 26kw Kohler Generator. Install (1) 200amp Automatic Transfer Switch. Install approx. 10' of Electrical Feed from Generator to Automatic Transfer Swi | Pender County | — |
| Sep 16, 2026 | Residential Gas Piping Generator Installation Permit | Install (1) 20kw Kohler Generator. Remove Existing Meterbase Combo & Install (1) 200amp Automatic Transfer Switch. Install approx. 10' of Electrical Feed from G | Pender County | — |
| Sep 11, 2026 | Residential Gas Piping Generator Installation Permit | Turnkey Change Out Existing Generator & Haul Away. Install One 20kw Cummins Generator. Utilize Existing 200amp Automatic Transfer Switch. Utilize Existing Elect | Pender County | — |
| Aug 24, 2026 | Residential Electrical Stand Alone Permit | 1.) Convert Existing Light Fixture in the Garage to 120v and Install Six (6) New Light Bulbs. 2.) Replace Existing Panel in the Garage. Install One New Eaton "B | Pender County | — |
| Aug 12, 2026 | Residential Gas Piping Generator Installation Permit | Remove Existing Generac 200amp Automatic Transfer Switch & Install (1) New Cummins 200amp Automatic Transfer Switch. Install Approx. 20' of Electrical Feed from | Pender County | — |
Permit status
Where its permits stand, as the departments report them.
- Expired101
- Completed94
- Cancelled15
- Void10
- Issued7
- Additional information required3
- Pending1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.