Contractor · Specialty (solar, fire, telecom)

CALIFORNIA SOLAR SYSTEMS INC

233 building permits since 2009 in Los Angeles city, CA; San Diego County, CA and Norwalk city, CA, across 15 counties — $838,941 in reported job value over 47 permits that state one.

Building permits
233
Reported job value
$838.9K
Active
2009–2024
Latest permit
Nov 14, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA88
  • San Diego County, CA40
  • Norwalk city, CA15
  • Kings County, CA14
  • Riverside city, CA11
  • Merced city, CA10
  • Sacramento city, CA9
  • Vista city, CA8
  • Oceanside city, CA7
  • Mountain View city, CA6

Permits by year

By issue date (application date where there is none).

03060
56
20102013201620192024
View as table
YearPermits
20093
20101
20112
20126
20136
20144
201519
201650
201756
201847
201935
20201
20231
20242

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar167
  • Electrical125
  • Roofing28
  • Plumbing9
  • HVAC8
  • Electric meters5
  • Battery storage1
  • Remodels1
  • Bathrooms1
  • Water heaters1

Permit types

As the building departments classify them.

  • Electrical89
  • Existing21
  • 340-R14
  • BRES11
  • Building Misc - Photovoltaic System (PV)8
  • Single Family8
  • 00 PHOTOVOLTAIC SYSTEMS6
  • BL, EL, CH5

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 14, 2024MISRsolar installation 8.8 KW DC roof mount 23 solar panels 23 Enphase micro invertersSacramento County$24,000
Aug 1, 2024ELECTRICAL NO PLCK—Camarillo City—
May 17, 2023ELECTRIC RESIDENTIALREMOVE 9 SOLAR PANELS PVDavis City$3,000
Jan 30, 2020B-BSP SolarRESIDENTIAL: ROOF MOUNTED PHOTOVOLTAIC SYSTEM 11.60 KW, (40) MODULAR PANELS, PANEL UPGRADE FROM 100 AMP TO 225 AMPRedlands City—
Jul 11, 2019ElectricalPV1 PLAN CHECK FOR NEW ROOFTOP MOUNTED PV SYSTEM ON EXISTING SFD. SYSTLos Angeles City—
Jul 9, 2019Electrical—Los Angeles City—
Jun 17, 2019ElectricalPV1, ROOF MOUNTED SOLAR SYSTEM USING (22) MICROINVERTERS. TOTAL SYSTEMLos Angeles City—
Jun 17, 2019Electrical—Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated117
  • Completed63
  • Finaled28
  • Issued21
  • Expired3
  • Withdrawn1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • CALIFORNIA SOLAR SYSTEMS
  • CALIFORNIA SOLAR
  • CALIFORNIA SOLAR PARTNERS INC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.