Contractor · General building
FAGAN CONSTRUCTION INC
16 building permits since 2000 in Citrus County, FL; Ocala city, FL and Levy County, FL, across 3 counties — $619,000 in reported job value over 3 permits that state one.
- Building permits
- 16
- Reported job value
- $619K
- Active
- 2000–2026
- Latest permit
- Sep 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Citrus County, FL12
- Ocala city, FL2
- Levy County, FL1
- Crystal River city, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2000 | 1 |
| 2001 | 1 |
| 2015 | 1 |
| 2024 | 2 |
| 2025 | 8 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- New construction5
- Electrical3
- Remodels2
- Plumbing2
- Demolition2
- Windows & doors2
- Water heaters2
- Pools & hot tubs2
- Accessory dwelling units1
- Gas1
Permit types
As the building departments classify them.
- Amendment6
- Accessory Structure2
- Residential2
- Building1
- COMM BLDG - RENOVATION1
- Demolition1
- New Sfd1
- Residential Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 28, 2026 | Residential | Residential Remodel with electric: Demo, existing enclosed second story porch windows and knee walls to open up covered porch and add railings. Remove windows a | Citrus County | — |
| May 26, 2026 | Residential Building Permit | Construction of new single-family residence | Levy County | $254,000 |
| Apr 29, 2026 | Amendment | Changing panel from 200 amps to 400 amps. | Citrus County | — |
| Dec 8, 2025 | Residential | NEW SFD ** NOC FOR NEW SFD IN OR BK:3623 PG:392** SEPARATE PERMITS REQUIRED FOR DETACHED GARAGE AND POOL ** FLOOD ZONE: AE/X - STRUCTURE LOCATED IN ZONE: X - FL | Citrus County | — |
| Nov 17, 2025 | Amendment | Changes in the following: -Floor Trusses due to earlier foundation change-Addition of a second AC unit-Moving water heater and extending closet for a utility cl | Citrus County | — |
| Nov 7, 2025 | Accessory Structure | CONSTRUCTION OF DETACHED GARAGE - 25X50 / RECORDED NOC REQUIRED / RECORDED NOC MUST BE ON SITE IN PERMIT PACKAGE FOR INSPECTOR REVIEW / FLOOD ZONE: AE/X - STRUC | Citrus County | — |
| Nov 6, 2025 | Accessory Structure | Construction of accessory dwelling structure / RECORDED NOC REQUIRED / RECORDED NOC AND PRODUCT APPROVAL MUST BE ON SITE IN PERMIT PACKAGE FOR INSPECTOR REVIEW | Citrus County | — |
| Aug 19, 2025 | Amendment | Plan change showing fireplace on exterior as gas not electric. Gas has been inspected and closed in permit BLD202502554 | Citrus County | — |
Permit status
Where its permits stand, as the departments report them.
- Closed8
- Issued2
- Finaled2
- Active1
- Approved1
- Cancelled1
- Pending payment1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.