Contractor · Specialty (solar, fire, telecom)
ADT SOLAR LLC
234 building permits since 2021 in Riverside city, CA; Sacramento County, CA and Oceanside city, CA, across 8 counties — $4,852,659 in reported job value over 137 permits that state one.
- Building permits
- 234
- Reported job value
- $4.9M
- Active
- 2021–2025
- Latest permit
- Mar 15, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Riverside city, CA60
- Sacramento County, CA41
- Oceanside city, CA28
- San Diego County, CA26
- Temecula city, CA25
- Sacramento city, CA16
- Elk Grove city, CA12
- Madera city, CA8
- Merced city, CA7
- Vista city, CA5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 3 |
| 2022 | 69 |
| 2023 | 128 |
| 2024 | 5 |
| 2025 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar184
- Electrical96
- Roofing57
- Battery storage33
- Plumbing19
- Water heaters13
- Electric meters10
- HVAC6
- Windows & doors2
- Gas1
Permit types
As the building departments classify them.
- Residential60
- MISR26
- SFD SOLAR PV - SIMPLE20
- BLDG - Building (R)19
- Single Family13
- ONLINE SOLAR PHOTOVOLTAIC PERMITS9
- PHOTOVOLTAIC SYSTEMS7
- BLDG - Electrical (R)6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 15, 2025 | MISR | 6.46kW photovoltaic system using 17 SILFAB 380 panels, (1) 10kWh enphase encharge battery and 225/110A MPU, CH-01=For the MSP, SMUD had requested that we reloca | Sacramento County | $50,726 |
| Apr 12, 2024 | MISR | Roof Mount PV Solar with 12.16 kW (32) Silfab380 Modules, (32) Enphase IQ8Plus Microinverters, (1) Enphase Encharge Battery & Panel Upgrade is required | Sacramento County | $79,178 |
| Mar 18, 2024 | COXX | CH-01 Corrections to the inspection that failed 11/22/23: 1.) Provide array placard that reflects roof top array. (lay out change) 2.) SMUD requires 8" from cen | Sacramento County | — |
| Mar 18, 2024 | MISR | - Main Panel De-rate - Solar system install on residential home. 25 panels, 1 enphase battery - Main panel de-rate -, CH-01 Corrections to the inspection that f | Sacramento County | $62,113 |
| Jan 26, 2024 | BLDG - Building (R) | Online. Roof mount solar 3 panels 5.20 kW with (2) 13.5 kwh and energy gateway. Demirdjian residence | Temecula City | — |
| Jan 16, 2024 | Residential | INSTALL PV SYSTEM ON RESIDENTIAL ROOF: 14 PANELS & 5.60KW | Riverside City | $16,800 |
| Dec 14, 2023 | SFD SOLAR APP PLUS WITH ESS | 19 PV Roof mounted panels 7.22 Kw, MPU (1) Enphase battery | Oceanside City | — |
| Dec 4, 2023 | Residential | INSTALL PV SYSTEM WITH (8) PANELS AND 3.20 KW ON RESIDENTIAL ROOF 1 ENPHASE ENCHARGE BATTERY | Riverside City | $8,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued71
- Completed51
- Finaled31
- Expired27
- Active13
- Closed10
- Cancelled8
- Not stated6
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.