Contractor · Electrical

Daniel Philip Kidd

16 building permits since 2024 in Orleans Parish, LA.

Building permits
16
Reported job value
—
Active
2024–2026
Latest permit
Feb 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA16

Permits by year

By issue date (application date where there is none).

0510
9
202420252026*
* 2026 is year to date.
View as table
YearPermits
20246
20259
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Generators13
  • Electrical7
  • Electric meters2
  • Gas1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 6, 2026—NEED METER RELEASE FOR GEN INSTALL : 22kW whole home Generac Generator , installation of a 200amp transfer switchOrleans Parish—
Dec 30, 2025—Installation of a 22kW whole home generator (Generac) , 200amp transfer switch , generator pad, 3 load sheds , 3 soft starts, primary surgeOrleans Parish—
Oct 16, 2025—Reconnect of power following disconnect by Utility company for installation of whole home generator.Orleans Parish—
Oct 15, 2025—Installation of a whole home Generac generator - 22kW , 2 - 150amp transfer switches , primary surge protector, electrical & gas runsOrleans Parish—
Aug 26, 2025—22 kw gen, 200a xfer, surge protector, 24” gen stand, (4) wireless co detectors,Orleans Parish—
Jul 2, 2025—Installation of a whole home Generac generator : 18kW , gen pad , 150 transfer switch , surge protectorOrleans Parish—
Jul 2, 2025—Electrical work for generator Installation - 24kw generator , 200amp transfer switch, (2) loadsheds , surge protectorOrleans Parish—
Jun 17, 2025—18 kw generator, gen pad, 200a xfer, 10 yr extended warranty, surge protector to an existing single family home.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Finaled9
  • Issued4
  • Void1
  • Closed1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.