Contractor · Plumbing

Daisey Design

16 building permits since 2025 in Talbot County, MD — $817,700 in reported job value over 16 permits that state one.

Building permits
16
Reported job value
$817.7K
Active
2025–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Talbot County, MD16

Permits by year

By issue date (application date where there is none).

07.515
15
20252026*
* 2026 is year to date.
View as table
YearPermits
20251
2026 (YTD)15

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing6

Permit types

As the building departments classify them.

  • Marine Construction / Shoreline Stabilization Permit16

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Marine Construction / Shoreline Stabilization PermitInstall riprap in front of existing bulkhead, 205 linear feetTalbot County$60,000
Oct 13, 2026Marine Construction / Shoreline Stabilization PermitIn-kind replacement of an existing 5 ft x 46 ft pier with a 10 ft x 20 ft L-shaped platform, extending a maximum of 56 feet from the mean high waterline. The exTalbot County$25,000
Sep 11, 2026Marine Construction / Shoreline Stabilization Permitconstruct a living shoreline that is 37' long and 13' wideTalbot County$28,000
Sep 10, 2026Marine Construction / Shoreline Stabilization PermitConstruct 34 feet of stone revetment within a maximum of 10 feet channelward of the mean high water line; Remove an existing pier and associated structures prioTalbot County$43,000
Aug 7, 2026Marine Construction / Shoreline Stabilization PermitConstruct and backfill 220 linear feet of replacement timber bulkhead within a maximum of 18 inches channelward of a deteriorated bulkhead in accordance with MDTalbot County$90,000
Jul 23, 2026Marine Construction / Shoreline Stabilization PermitConstruct and backfill 124 linear feet of replacement timber bulkhead within a maximum of 18 inches channelward of a deteriorated bulkhead; Remove an existing pTalbot County$106,000
Jun 12, 2026Marine Construction / Shoreline Stabilization PermitRemove an existing floating platform prior to commencement of construction; Construct a boat lift with associated piles within a maximum of 130 feet channelwardTalbot County$33,000
May 22, 2026Marine Construction / Shoreline Stabilization PermitConstruct 175 feet of stone revetment within a maximum of 7 feet channelward of the mean high water line; Remove an existing pier and associated structures prioTalbot County$111,000

Permit status

Where its permits stand, as the departments report them.

  • Active11
  • Completed5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.