Contractor · Pools & outdoor
BOBBY CAHOON CONSTRUCTION, INC
16 building permits since 2020 in Emerald Isle town, NC; Swansboro township, NC and Onslow County, NC, across 2 counties — $732,226 in reported job value over 16 permits that state one.
- Building permits
- 16
- Reported job value
- $732.2K
- Active
- 2020–2024
- Latest permit
- Oct 17, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Emerald Isle town, NC9
- Swansboro township, NC5
- Onslow County, NC1
- White Oak township, NC1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 2 |
| 2021 | 5 |
| 2022 | 2 |
| 2023 | 2 |
| 2024 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Building4
- Project3
- Residential Accessory3
- Commercial Building - Commercial Accessory2
- Residential Accessory - Dock and Pier2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 17, 2024 | Residential Accessory | INSTALL NEW VINYL RETAINING WALL, 88' LONG WITH 3'-4' EXPOSURE. INCLUDES 14' LONG WINGBACK ON EACH SIDE. INSTALL NEW VINYL SEAWALL, 90' LONG WITH 3'-4' EXPOSURE | Swansboro township | $51,165 |
| Sep 12, 2024 | Residential Accessory - Dock and Pier | Install new concrete pier. | Onslow County | $18,880 |
| Aug 30, 2024 | Commercial Building - Commercial Accessory | Install new concrete pier. | Swansboro township | $18,200 |
| Mar 8, 2024 | Residential Accessory | Install new vinyl seawall, new concrete pier, new piling for future boat lift (see scope of work attacched) | Swansboro township | $31,285 |
| Feb 16, 2024 | Residential Accessory | Install new boat ramp, new boat lift, timber steps (see scope of work) | Swansboro township | $55,431 |
| May 1, 2023 | Project | Install new 5'x100' concrete pier walkway connecting to a 13'x20' platform with a 5'x20' stepdown swim platform. Install new boat lift on 4 new pilings | Emerald Isle Town | $61,596 |
| Jan 27, 2023 | Project | Install new boat lift. This will include the installation of four (4) new 10"x30' long pilings | Emerald Isle Town | $13,974 |
| Oct 7, 2022 | Commercial Building - Commercial Accessory | Install a new concrete pier consisting of a 5' wide x 200' long walkway connection to a 13' x '20 long platform. | White Oak township | $67,200 |
Permit status
Where its permits stand, as the departments report them.
- Not stated7
- Expired3
- Completed3
- Issued2
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.