Contractor · Electrical

MOF LLC DBA: Michael & Son Services of NC LLC

237 building permits since 2019 in Brunswick County, NC; Pender County, NC and Stump Sound township, NC, across 4 counties — $1,984,819 in reported job value over 168 permits that state one.

Building permits
237
Reported job value
$2M
Active
2019–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brunswick County, NC150
  • Pender County, NC66
  • Stump Sound township, NC5
  • Sunset Beach town, NC5
  • Burgaw town, NC3
  • Henderson city, NC3
  • Jacksonville township, NC1
  • Richlands township, NC1
  • Vance County, NC1
  • Half Moon CDP, NC1

Permits by year

By issue date (application date where there is none).

04080
62
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20195
202010
20216
202213
202343
202462
202558
2026 (YTD)40

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical216
  • Electric meters22
  • HVAC21
  • Generators20
  • Pools & hot tubs11
  • Heat pumps10
  • Plumbing9
  • Water heaters8
  • EV chargers6
  • Kitchens5

Permit types

As the building departments classify them.

  • INCLUDED ELECTRICAL81
  • Residential Electrical Stand Alone Permit66
  • ELECTRICAL47
  • RECONNECT15
  • Residential Mechanical - Change Out5
  • Mechanical4
  • Commercial Electrical Stand Alone Permit3
  • Trade - Electrical3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026Residential Mechanical - Change OutMichael and son HVAC - Install a 1.5 ton split heat pump system with 5KW electrical disconnect and reconnect needed - ODU - outside AHU - frogRichlands township—
Oct 9, 2026INCLUDED ELECTRICALWiring Unit: 1 Ton: 3.00 KW: 8Brunswick County$3,150
Oct 8, 2026ELECTRICALElectric for Water HeaterBrunswick County—
Oct 8, 2026INCLUDED ELECTRICALWiring Unit: 1 Ton: 5.00 KW: 10Brunswick County$15,948
Oct 7, 2026INCLUDED ELECTRICALWiring Unit: 1 Ton: 3.00 KW: 8Brunswick County$15,693
Sep 2, 2026ELECTRICAL8KW electrical disconnect and reconnect neededBrunswick County$16,465
Sep 2, 2026RECONNECTMichael and son HVAC - Install a 3 ton split heat pump system with an 8KW electrical disconnect and reconnect needed ODU - outside AHU - pulldownBrunswick County$16,465
Aug 27, 2026Residential Mechanical - Change OutMichael and son HVAC - Install a 3.5 ton split heat pump system with an 8KW electrical disconnect and reconnect needed - ODU - outside AHU - attic ( walk in )Stump Sound township—

Permit status

Where its permits stand, as the departments report them.

  • Active150
  • Completed40
  • Expired32
  • Void4
  • Closed4
  • Cancelled3
  • Issued1
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.