Contractor · Electrical

ALEXEY BYCHKOV

16 building permits since 2017 in Marin County, CA — $95,890 in reported job value over 16 permits that state one.

Building permits
16
Reported job value
$95.9K
Active
2017–2023
Latest permit
Jun 10, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marin County, CA16

Permits by year

By issue date (application date where there is none).

024
4
2017201920212023
View as table
YearPermits
20171
20182
20192
20203
20212
20224
20232

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • Electric meters5
  • Kitchens4
  • HVAC2
  • Heat pumps1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • RESIDENTIAL16

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 10, 2023RESIDENTIALService upgrade 100 amp to 200 amp. Install 2 dedicated circuits 20amp 120v 1st kitchen countertop plug 2nd to furnace.Marin County$7,500
Jun 10, 2023RESIDENTIALService upgrade from 100 amps to 200 amps. In the garage install dedicated circuits for dryer, rv, washer, fridge and bench plugs.Marin County$10,500
Nov 12, 2022RESIDENTIALService panel upgrade 100amps to 200ampsMarin County$4,500
Oct 25, 2022RESIDENTIALService panel and garage subpanel upgrade.Marin County$7,500
Jun 14, 2022RESIDENTIAL1) On the side of the garage upgrade/turn existing meter main 100amp to 200 amp sub panel. 2) On the side of the house install a new 200 amp meter main panel wiMarin County$8,500
Jan 19, 2022RESIDENTIAL1.On the side of the garage remove existing meter main 100amp upgrade to new 125 amp sub panel turn facing into the garage. 2. On the concrete brick wall behindMarin County$9,800
Sep 8, 2021RESIDENTIALScope of Work: 1) Upgrade existing 100 amp panel to 200 amp. On the front left side of the garage wall behind the gate install a new 200 amp meter main panel. 2Marin County$7,500
Mar 16, 2021RESIDENTIAL1) Upgrade existing 200 amp meter main Zinsco panel to Square D 200 meter main 2) Install 48 amp 240 volt tesla Gen3 charger 3) Install 50 amp 240 volt dedicateMarin County$6,500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.