Contractor · Specialty (solar, fire, telecom)

AKEENA INC

16 building permits since 2004 in Santa Cruz County, CA and Los Altos Hills town, CA, across 2 counties.

Building permits
16
Reported job value
—
Active
2004–2010
Latest permit
Sep 1, 2010

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA15
  • Los Altos Hills town, CA1

Permits by year

By issue date (application date where there is none).

024
4
2004200620082010
View as table
YearPermits
20044
20052
20063
20071
20083
20091
20102

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar15
  • Electrical14
  • Roofing4
  • Additions1

Permit types

As the building departments classify them.

  • Building15
  • Other1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 1, 2010BuildingInstall a new roof mounted photovoltaic electrical system on an existing SFD (31' max ht). Note: The building inspector may require building plans or modificatiSanta Cruz County—
Aug 4, 2010BuildingSent to fire. Install a roof mounted photovoltaic electrical system not to exceed 31' in height on an existing SFD. Note: the building inspector may require rooSanta Cruz County—
Mar 24, 2009BuildingInstall a roof mounted photovoltaic electrical system on an existing SFD (not to exceed 31' in height). The building inspector may require roof structural plansSanta Cruz County—
Dec 19, 2008BuildingEL: Install a roof mounted photovoltaic electrical system on a SFD not to exceed 31 feet in height. The Building Inspector may require roof structural plans or Santa Cruz County—
Oct 10, 2008BuildingEL: Install a flush mounted Solar Photovoltaic system to the roof of an existing SFD. Inspector may require plans or roof modifications for additional loads. MaSanta Cruz County—
Oct 2, 2008BuildingInstall a roof-mounted photovoltaic electrical system on an existing SFD only. On site with multiple structures. The Building inspector may require roof structuSanta Cruz County—
Sep 18, 2007BuildingEL: Install a roof mounted photovoltaic electrical system on a SFD not to exceed 31 feet in height. The Building Inspector may require roof structural plans or Santa Cruz County—
Oct 27, 2006BuildingInstall ground mounted photovoltaic electrical system on site with an existing SFD.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Not stated3

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • AKEENA
  • AKEEN A INC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.