Contractor · Electrical
WALT'S PUMP REPAIR
17 building permits since 2017 in Jacksonville township, NC; Swansboro township, NC and Onslow County, NC, across 2 counties — $25,000 in reported job value over 2 permits that state one.
- Building permits
- 17
- Reported job value
- $25K
- Active
- 2017–2025
- Latest permit
- Feb 24, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Jacksonville township, NC5
- Swansboro township, NC4
- Onslow County, NC3
- Stump Sound township, NC3
- Emerald Isle town, NC2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 2 |
| 2019 | 3 |
| 2020 | 2 |
| 2021 | 3 |
| 2022 | 3 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical13
- Gas1
- Plumbing1
- Electric meters1
- New construction1
Permit types
As the building departments classify them.
- Commercial Electrical - Commercial New7
- Residential Electrical - Repair2
- Commercial Building - Commercial New Construction1
- Commercial Electrical - Commercial Electrical.21
- Commercial Electrical - Commercial Repair1
- Electrical1
- Gas1
- Residential Electrical - Residential Single RV (RA Zone)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 24, 2025 | Residential Electrical - Residential Single RV (RA Zone) | SERVICE TO RV / CAMPER | Stump Sound township | — |
| Jan 7, 2025 | Residential Electrical - Repair | REPAIR | Stump Sound township | — |
| May 19, 2022 | Commercial Electrical - Commercial New | Connect fueling equipment to load side of service. Run conduit and wire to fueling equipment and make final terminations. | Swansboro township | — |
| May 19, 2022 | Commercial Electrical - Commercial New | Connect fueling equipment to load side of service. Run conduit and wire to fueling equipment and make final terminations. | Jacksonville township | — |
| May 19, 2022 | Commercial Electrical - Commercial New | Connect fueling equipment to load side of service. Run conduit and wire to fueling equipment and make final terminations. | Onslow County | — |
| Dec 7, 2021 | Electrical | ELECTRIC FOR PUMP UPGRADE | Emerald Isle Town | $12,500 |
| Dec 7, 2021 | Gas | REPLACE GAS LINES FOR PUMPS | Emerald Isle Town | $12,500 |
| Sep 2, 2021 | Residential Manufactured Home - Multi Wide Moved | Setup MW MH 28 x 60 1986 | Stump Sound township | — |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Expired3
- Not stated2
- Void1
- Approved1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.