Contractor · Plumbing
UNDERGROUND EXCAVATING SOLUTIONS
17 building permits since 2022 in Tacoma city, WA — $436,500 in reported job value over 16 permits that state one.
- Building permits
- 17
- Reported job value
- $436.5K
- Active
- 2022–2024
- Latest permit
- Mar 21, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tacoma city, WA17
Permits by year
By issue date (application date where there is none).
07.515
11
202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 11 |
| 2023 | 5 |
| 2024 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing7
Permit types
As the building departments classify them.
- Utility Connection17
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 21, 2024 | Utility Connection | Decommission existing holding tank and install new sewage holding tank at SFD. No Right of Way work or Patch included. | Tacoma City | $15,000 |
| Aug 2, 2023 | Utility Connection | Side sewer replacement of up to 35 feet using 4 schedule 35 PVC pipe at SFD. Replacement will be made from existing cast iron from outside of the foundation to | Tacoma City | $5,000 |
| Jun 5, 2023 | Utility Connection | OPEN TRENCH REPAIR OF THE SANITARY SEWER ON PRIVATE PROPERTY. NO RIGHT OF WAY WORK OR PATCH INCLUDED. | Tacoma City | $20,000 |
| May 26, 2023 | Utility Connection | OPEN TRENCH REPLACEMENT OF THE SANITARY SEWER IN THE RIGHT OF WAY. ONE DAY APPROVED TCP. NO PATCH INCLUDED. | Tacoma City | $30,000 |
| Mar 24, 2023 | Utility Connection | Replacement of sanitary sewer line. Open trench method. No ROW. | Tacoma City | $50,000 |
| Mar 15, 2023 | Utility Connection | OPEN TRENCH REPLACEMENT OF THE SANITARY SEWER ON PRIVATE PROPERTY. NO RIGHT OF WAY WORK OR PATCH INCLUDED. | Tacoma City | $30,000 |
| Dec 16, 2022 | Utility Connection | OPEN TRENCH REPLACEMENT OF THE SANITARY SEWER ON PRIVATE PROPERTY. NO RIGHT OF WAY WORK OR PATCH INCLUDED. | Tacoma City | $12,000 |
| Dec 9, 2022 | Utility Connection | Install 1 HDPE poly waterline from existing water meter to outside of the foundation, on the Southwest side of the existing building (2501). Connection will be | Tacoma City | $8,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled12
- Issued4
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.