Contractor · Specialty (solar, fire, telecom)
SUN DOLLAR SOLAR.
17 building permits since 2017 in Redlands city, CA; Los Angeles city, CA and Riverside city, CA, across 4 counties — $2,000 in reported job value over 1 permits that state one.
- Building permits
- 17
- Reported job value
- $2K
- Active
- 2017–2024
- Latest permit
- Feb 14, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Redlands city, CA9
- Los Angeles city, CA3
- Riverside city, CA2
- Temecula city, CA2
- San Diego County, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 3 |
| 2018 | 2 |
| 2019 | 4 |
| 2020 | 1 |
| 2021 | 3 |
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar12
- Electrical7
- Battery storage1
- Roofing1
- Electric meters1
Permit types
As the building departments classify them.
- B-BSP Solar9
- Electrical3
- BLDG - Building (R)2
- BRES1
- Existing1
- Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 14, 2024 | Residential | INSTALL PV SYSTEM WITH 21 PANELS AND 8.4 KW ON RESIDENTIAL ROOF ENERGY STORAGE SYSTEM | Riverside City | — |
| Mar 28, 2023 | BLDG - Building (R) | — | Temecula City | — |
| Nov 16, 2022 | BLDG - Building (R) | — | Temecula City | — |
| Feb 8, 2022 | B-BSP Solar | RESIDENTIAL: (N) 10.4kwdc PV SOLAR (ROOF MOUNTED), (26) MODULES | Redlands City | — |
| Oct 21, 2021 | B-BSP Solar | RESIDENTIAL: INSTALL (72) 3-STRING INVERTERS AND (1) NEW SUB-PANEL (PV LOAD CENTER) 28.8 KW. | Redlands City | — |
| Aug 5, 2021 | B-BSP Solar | RESIDENTIAL: (N) 17.6kwdc PV SOLAR (ROOF MOUNTED), (44) MODULES | Redlands City | — |
| Jan 13, 2021 | B-BSP Solar | 6.65 Kw roof mounted solar system with (19) modules and no service panel upgrade. | Redlands City | — |
| Sep 25, 2020 | B-BSP Solar | RESIDENTIAL: ROOF MOUNTED PHOTOVOLTAIC SYSTEM 9.62 KW AND (26) MODULES | Redlands City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled9
- Not stated4
- Completed2
- Issued1
- Withdrawn1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.