Contractor · Electrical

S R BRAY LLC

17 building permits since 2015 in Mesa city, AZ and Phoenix city, AZ — $696,666 in reported job value over 15 permits that state one.

Building permits
17
Reported job value
$696.7K
Active
2015–2026
Latest permit
Sep 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ16
  • Phoenix city, AZ1

Permits by year

By issue date (application date where there is none).

01.53
3
2018202120242026*
* 2026 is year to date.
View as table
YearPermits
20151
20181
20202
20212
20233
20242
20253
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • Electric meters4

Permit types

As the building departments classify them.

  • Other Commercial14
  • Commercial/Industrial Projects1
  • SE1
  • Svc (PSF) -- Use Permits1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 30, 2026Other CommercialInstall electrical 200A SES and meter for construction site power. New 200A panel with (1) 50A breaker for twist lock outlet. Results in CofC.Mesa$20,463
Aug 24, 2026Other CommercialPower Plus will provide and install (1) 600A 120/208V 3PH U/G SES to match utility source to provide temporary power to job site.Mesa$57,871
Jun 23, 2026Other CommercialInstall a 100A single phase electrical meter, electrical panel, and receptacle for temporary power at construction site for a new hotel (PMT25-14213). Results iMesa$18,462
Nov 5, 2025Other CommercialNew pole mounted 200A 3phase temporary power electrical meter at construction site for PMT25-01486. Results in CoC.Mesa$8,225
Aug 19, 2025Other CommercialTemp 100A 120/240V 1PH wall mounted SES fed off overhead riser to provide temporary power to job site. Per engineered plans. Results in CoC.Mesa$9,475
Jul 10, 2025Other CommercialTHIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION FIELD OFFICE FOR USE BY CONTRACTORS WHILE A PERMANENT BUILDING IS UNDER CONSTRUCTION. THE CONSTRUCTION TRAILERMesa—
Oct 15, 2024Other CommercialTo provide temporary powerMesa$25,548
Aug 13, 2024Other CommercialTo provide temporary power to construction site. New temporary single phase electric meter.Mesa$39,087

Permit status

Where its permits stand, as the departments report them.

  • C/o issued12
  • Issued4
  • Completed1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • SR BRAY
  • SR BRAY LLC

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.