Contractor · Specialty (solar, fire, telecom)

Solarmax Rep

17 building permits since 2021 in Cypress city, CA.

Building permits
17
Reported job value
—
Active
2021–2025
Latest permit
May 20, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Cypress city, CA17

Permits by year

By issue date (application date where there is none).

0510
10
20212022202320242025
View as table
YearPermits
20211
20224
202310
20241
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar16
  • Electrical6
  • Battery storage2
  • EV chargers1

Permit types

As the building departments classify them.

  • Solar Residential Rooftop Permit16
  • Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 20, 2025Solar Residential Rooftop PermitInstallation of (36) Roof mounted solar panels with (36) Micro Inverters = 12.06 kWCypress City—
Feb 14, 2024Solar Residential Rooftop PermitInstallation of (19) Roof mounted solar panels with (19) Micro Inverters = 7.695 kW, Installation of (1) Enphase Encharge 10 Battery and (1) Enpower Smart SwitcCypress City—
Aug 31, 2023Solar Residential Rooftop PermitInstallation of (32) Roof mounted solar panels with (32) Micro Inverters = 10.72 kWCypress City—
Aug 31, 2023Solar Residential Rooftop PermitInstallation of (36) Roof mounted solar panels with (36) Micro Inverters = 12.06 kWCypress City—
Aug 14, 2023Solar Residential Rooftop PermitInstallation of (20) Roof mounted solar panels with (20) Micro Inverters = 6.7 kW with a 225A/200A main panel upgrade.Cypress City—
Jul 11, 2023Solar Residential Rooftop PermitInstallation of 24 Roof mounted solar panels with 24 Micro Inverters = 8.040kW with no MPUCypress City—
Jun 20, 2023Electrical PermitInstall (1) EV OutletCypress City—
Jun 7, 2023Solar Residential Rooftop PermitInstallation of (30) Roof mounted solar panels with (30) Micro Inverters = 10.050 kW with a 225A/200A main panel upgradeCypress City—

Permit status

Where its permits stand, as the departments report them.

  • Completed15
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.