Contractor · Electrical
SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS
17 building permits since 2022 in Monterey County, CA; Scotts Valley city, CA and Santa Cruz city, CA, across 2 counties — $1,079,651 in reported job value over 15 permits that state one.
- Building permits
- 17
- Reported job value
- $1.1M
- Active
- 2022–2026
- Latest permit
- Aug 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Monterey County, CA10
- Scotts Valley city, CA4
- Santa Cruz city, CA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 1 |
| 2025 | 2 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar12
- Electrical12
- Battery storage11
- Additions1
- Generators1
Permit types
As the building departments classify them.
- Electrical9
- Electrical Permit3
- PV & ES Systems3
- Residential PV Solar ONLY1
- Revision1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 11, 2026 | PV & ES Systems | 5.28kW ROOF MOUNTED GRID-TIED PV with 15kWh ESS | Santa Cruz City | $444,441 |
| Mar 25, 2026 | Electrical | Residential roof mounted photovoltaic system. 11 kw 25 panels, (1) energy storage system 13.5 kwh, and (1) tesla backup switch. Existing electrical panel will b | Monterey County | $65,615 |
| Mar 13, 2026 | Electrical | Change tesla powerwall 2 to tesla powerwall 3 of 11.5 kw and change tesla back up gateway 2 to a tesla back up 3 of 200 amp. Still tapping into 100 amp main. No | Monterey County | — |
| Feb 24, 2026 | Electrical | Installation of a (9) hyndai hin -t440nf pv module 3.96 kw and (9) enphase micro inverter and (1) tesla powerall 3 of 11.5 kw and (1) tesla backup gateway 3 of | Monterey County | $50,035 |
| Feb 14, 2026 | Electrical | Install (1) franklin apower 2 battery (15kwh, 10kw) and (1) franklin agate tapping into 100a main service panel and existing generator. | Monterey County | $30,700 |
| Feb 4, 2026 | Electrical | Residential roof mounted photovoltaic system. 17.1 kw 39 panels. Existing electrical panel will be used. 400 amps - install (39) hyundai pv modules totaling 17. | Monterey County | $35,000 |
| Jan 23, 2026 | Electrical | Two 13.5 kw tesla powerall 3 dc expansion batteries interconnected with the existing ess. | Monterey County | $27,246 |
| Jan 15, 2026 | Electrical | Install (1) tesla backup gateway 3 of 200a and (1) tesla power wall 3 of 13.5 kw. Tapping into 200a main | Monterey County | $24,960 |
Permit status
Where its permits stand, as the departments report them.
- Finaled8
- Completed5
- Active3
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.