Contractor · Electrical

Ryan McCollister

17 building permits since 2022 in Talbot County, MD.

Building permits
17
Reported job value
—
Active
2022–2026
Latest permit
Aug 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Talbot County, MD17

Permits by year

By issue date (application date where there is none).

02.55
5
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20222
20235
20244
20254
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical17
  • Electric meters5
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical Permit (Stand Alone)17

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 12, 2026Electrical Permit (Stand Alone)Replacing Branch circuits that were damage in a fire that started in crawls space area. Service Looks to be ok and in working order. Power has been turned off tTalbot County—
Apr 22, 2026Electrical Permit (Stand Alone)Reconnect Power To Dewelling.Talbot County—
Nov 19, 2025Electrical Permit (Stand Alone)Install 100 amp Servies at the entry of Driveway and install new lightTalbot County—
Aug 20, 2025Electrical Permit (Stand Alone)Installing 320 meter pan with 2-150amp disconnect and a new 40 space weather proof panel with all new breakers and all new groundingTalbot County—
Aug 5, 2025Electrical Permit (Stand Alone)Service upgrade and relocating new panel to a outside wall because exsiting Panel is behind fridge.Talbot County—
Jul 14, 2025Electrical Permit (Stand Alone)We are adding a 100amp/240volt Electrical sevice for landscaping and irrigation systems being installed by others in a existing meter group. This meter group isTalbot County—
Oct 16, 2024Electrical Permit (Stand Alone)Service upgrade. Replacing 200 amp service with a new 200 amp service with new breakersTalbot County—
May 20, 2024Electrical Permit (Stand Alone)Replacing 200 amp Under ground meter socket with new meter socket because Existing one is rusted outTalbot County—

Permit status

Where its permits stand, as the departments report them.

  • Completed16
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.