Contractor · Plumbing
ROBERT W KNIGHT
17 building permits since 2018 in Marion County, OR; Jefferson city, OR and Benton County, OR, across 3 counties — $86,000 in reported job value over 15 permits that state one.
- Building permits
- 17
- Reported job value
- $86K
- Active
- 2018–2025
- Latest permit
- Oct 15, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marion County, OR9
- Jefferson city, OR4
- Benton County, OR1
- Aumsville city, OR1
- Tillamook County, OR1
- Salem city, OR1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 5 |
| 2020 | 3 |
| 2024 | 4 |
| 2025 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing17
- Bathrooms7
- Kitchens3
- Additions3
- Water heaters3
- Remodels2
- Accessory dwelling units1
- Electrical1
- New construction1
Permit types
As the building departments classify them.
- Residential Plumbing17
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2025 | Residential Plumbing | ADU Adding ADU with two car garage and office below. Full kitchen, full bath, and utility room with electric water heater | Tillamook County | $7,500 |
| Jul 30, 2025 | Residential Plumbing | 1 SKN, 1 TUB/S FOR Enlarge existing shower; tile shower walls Move lav rough in | Salem City | $3,500 |
| Jul 30, 2025 | Residential Plumbing | Rivercrest Shower 1 SKN, 1 TUB/S FOR Enlarge existing shower; tile shower walls Move lav rough in | Marion County | $3,500 |
| Jul 1, 2025 | Residential Plumbing | Garage Bar 1 SINK FOR Tie onto 2" pvc drain line underfloor and rough in new drain for bar sink in garage tie onto 1/2" cpvc underfloor and rough in hot and col | Marion County | $3,000 |
| Jul 1, 2025 | Residential Plumbing | 1 SINK FOR Tie onto 2" pvc drain line underfloor and rough in new drain for bar sink in garage tie onto 1/2" cpvc underfloor and rough in hot and cold water lin | Jefferson City | $3,000 |
| Aug 22, 2024 | Residential Plumbing | 1 LAVE FOR roughing in for a bar sink drain and water lines in outdoor kitchen underslab | Jefferson City | $3,500 |
| Aug 22, 2024 | Residential Plumbing | outdoor kitchen 1 LAVE FOR roughing in for a bar sink drain and water lines in outdoor kitchen underslab | Marion County | $3,500 |
| Jan 26, 2024 | Residential Plumbing | Niemuth WITHDRAWN - Addition to home with bathroom; slab rough in drainage, water and drainage top out, and fixture finish | Marion County | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled11
- Withdrawn5
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.