Contractor · Plumbing

Precision Plumbing and Heating Inc

240 building permits since 2003 in Minneapolis city, MN; Ramsey city, MN and Coon Rapids city, MN, across 2 counties — $18,420 in reported job value over 7 permits that state one.

Building permits
240
Reported job value
$18.4K
Active
2003–2026
Latest permit
Oct 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN209
  • Ramsey city, MN15
  • Coon Rapids city, MN10
  • Blaine city, MN5
  • Lino Lakes city, MN1

Permits by year

By issue date (application date where there is none).

01530
28
200720112017202020232026*
* 2026 is year to date.
View as table
YearPermits
20034
20071
20092
20104
20111
20122
20153
201723
201828
201925
202025
202121
202220
202313
202426
202522
2026 (YTD)20

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing228
  • Bathrooms128
  • Remodels79
  • Kitchens75
  • Water heaters40
  • Gas38
  • HVAC10
  • Electrical8
  • Additions4
  • New construction4

Permit types

As the building departments classify them.

  • Plumbing216
  • Commercial10
  • Residential5
  • BLDG - Commercial4
  • Mechanical3
  • BLDG - Residential1
  • Res Plumbing New-Addition-Remodel RI-Final1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 12, 2026PlumbingDisconnect dryer, cap and add shut off to code compliance Disconnect the gas range in the kitchen and add a shut off to code compliance.Minneapolis City—
Oct 8, 2026PlumbingInstall 3 toilets, 3 lav sinks, 1 sink, 1 hi/lo drinking fountain.Minneapolis City—
Sep 28, 2026Plumbingplumbing for a convenience store remodel. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All piMinneapolis City—
Sep 21, 2026BLDG - CommercialPlumbing - One Main FinancialBlaine City—
Aug 27, 2026PlumbingNew 3/4 Bath: Shower, toilet and lav sinkMinneapolis City—
Aug 17, 2026PlumbingThis home is getting a new sanitary sewer line installed into the building. The piping under the floor from the main stack all the way to the building clean-outMinneapolis City—
Jul 22, 2026PlumbingNEW 3/4 Primary Bath: Shower, toilet, lav sink Kitchen: Install new waterline for icemaker Replace electric water heater with new POWER-VENTED natural gas 50 gaMinneapolis City—
Jun 11, 2026PlumbingInstall DWV and waterlines for remodel of duplex: Install of fixtures as listed below. Replace repair p- traps on sinks 2 new 50 gallon water heaters- natural gMinneapolis City—

Permit status

Where its permits stand, as the departments report them.

  • Closed185
  • Finaled24
  • Issued18
  • Expired12
  • Cancelled1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.