Contractor · Plumbing
PETER C SIZENSKY
17 building permits since 2022 in Greenwich town, CT; Norwalk town, CT and Fairfield town, CT, across 2 counties — $34,500 in reported job value over 6 permits that state one.
- Building permits
- 17
- Reported job value
- $34.5K
- Active
- 2022–2026
- Latest permit
- Oct 30, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT13
- Norwalk town, CT2
- Fairfield town, CT1
- Monroe town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 6 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing14
- Bathrooms12
- Gas3
- Kitchens2
- Water heaters2
- HVAC1
- Remodels1
- Generators1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- PLU11
- PL22
- Plu No Fee2
- Plumbing1
- Residential Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 30, 2026 | Plumbing | Rework existing plumbing in master bathroom. Install owner's supplied shower valve and diverters. New owner's supplied bathtub, sinks, and toilet. Pex water lin | Fairfield Town | $3,000 |
| Sep 8, 2026 | Residential Plumbing Permit | Rework plumbing for kitchen sink, master bathroom, powder room. Connecting into existing plumbing and running PVC Pipe and Pex piping. | Monroe Town | $5,000 |
| May 1, 2026 | Plu No Fee | Supply rough plumbing and installation of owner's supplied fixtures. 2nd fl.- 2 toilets 3 sinks, 1 laundry, 2 showers. 1st fl-1 toilet, 2 sinks | Norwalk Town | $20,000 |
| Mar 7, 2025 | PLU | supply gas piping for pool heater; connect to pool heater; gas line 2 psi line | Greenwich Town | — |
| Feb 13, 2025 | Plu No Fee | Plumbing for full bath-#3 | Norwalk Town | $2,500 |
| May 8, 2024 | PLU | run new gas line for bbq; disconnect existing bq gas line; connect new gas line into existing main in basement | Greenwich Town | — |
| Feb 26, 2024 | PLU | connect gaspiping for generator, approx. 3 ft. of piping | Greenwich Town | — |
| Jan 3, 2024 | PLU | Rough plumbing for attic bathroom; pvo water lines and pvc waste lines. 3rd fl.: 1: wc, shower, 2: snks. | Greenwich Town | — |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Active5
- Issued1
- C/o issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.