Contractor · Specialty (solar, fire, telecom)

PATRIOT FIRE PROTECTION LLC

17 building permits since 2021 in Howard County, MD; Rockville city, MD and Arlington County, VA, across 3 counties.

Building permits
17
Reported job value
—
Active
2021–2026
Latest permit
Mar 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD8
  • Rockville city, MD6
  • Arlington County, VA3

Permits by year

By issue date (application date where there is none).

048
8
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20212
20224
20238
20241
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Fire sprinklers13
  • Remodels7
  • Additions4
  • Electrical1
  • New construction1

Permit types

As the building departments classify them.

  • Commercial Sprinkler Alteration Permit5
  • Fire3
  • Residential New-Addition SFD Sprinkler Permit2
  • Residential Alteration SFD Sprinkler Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 25, 2026Commercial Sprinkler Alteration PermitNOV/ MT AIRY CHRISTIAN ACADEMY/Removing and replacing the existing vertical fire pump. To be replaced with a horizontal fire pump. Replacing existing undergrounHoward County—
Apr 22, 2025FireReplace wet end of fire pumpArlington County—
Apr 12, 2024FireModifying existing system to provide proper coverage after tenant remodel, adding an addition to the 2nd floorArlington County—
Sep 12, 2023—Replacing existing fire pump and fire pump controller.Rockville City—
Aug 30, 2023FireModification to an existing system based on tenant layoutArlington County—
Jun 21, 2023Commercial Sprinkler Alteration PermitModify existing NFPA 13 wet system by adding/relocating (10) sprinkler heads. *MAX STORAGE HEIGHT NOT TO EXCEED 12' AT TOP OF STORAGE*Howard County—
Mar 15, 2023Residential Alteration SFD Sprinkler Permitmodify existing NFPA 13D wet system by adding/relocating approximately 6 sprinkler heads in basementHoward County—
Feb 24, 2023Residential New-Addition SFD Sprinkler PermitAddition of new sprinkler system, fed by pump and tank, for new home. - 39 HEADSHoward County—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Closed5
  • Finaled2
  • Expired1
  • Pending1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.