Contractor · General building
NATIONAL NETWORK SERVICES
17 building permits since 2024 in Asheville city, NC.
- Building permits
- 17
- Reported job value
- —
- Active
- 2024–2026
- Latest permit
- Jun 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Asheville city, NC17
Permits by year
By issue date (application date where there is none).
0510
10
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 5 |
| 2025 | 10 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Windows & doors8
- Remodels6
- Plumbing6
- Electrical6
- HVAC3
- Bathrooms3
- Demolition3
- Heat pumps2
- Gas1
- Kitchens1
Permit types
As the building departments classify them.
- Fire: Fire Alarm12
- Com: Low Voltage5
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 26, 2026 | Fire: Fire Alarm | 1 FOR 1 REPLACEMENT OF THE FIRE ALARM SYSTEM FOR BILTMORE OB-GYN. | Asheville | — |
| Mar 20, 2026 | Com: Low Voltage | REPLACEMENT OF VET CLINIC BASED ON DAMAGES FROM TS HELENE. REPAIRS INCLUDE SELECTIVE FRAMING REPLACEMENT, FLOOR REPLACEMENT, IN-WALL/OVERHEAD MEP TO PUT BACK WH | City Of Asheville | — |
| Dec 30, 2025 | Com: Low Voltage | CONSTRUCTION OF A NEW FREESTANDING RETAIL BRANCH FACILITY FOR FIFTH THIRD BANK WITH A TWO-LANE ATTACHED DRIVE THRU FOR OCCUPANCY FOR FIFTH THIRD BANK REC RESUBM | City Of Asheville | — |
| Nov 12, 2025 | Fire: Fire Alarm | SKYLAND UNITED METHODIST CHURCH Replacement of existing fire alarm panel. All other devices remaining the same. | Asheville | — |
| Sep 25, 2025 | Fire: Fire Alarm | ADDING 2 ADDRESSABLE RELAYS TO THE FIRE ALARM SYSTEM TO RELEASE MAGNETICALLY LOCKED DOORS WHEN THE FIRE ALARM ACTIVATES FOR OCEAN ASHEVILLE | Asheville | — |
| Sep 15, 2025 | Com: Low Voltage | COMMERCIAL ALTERATION, DEMO AND OCCUPANCY FOR CIVIL DESIGN CONCEPTS; 2A, #2B, and #260 Demo of walls and flooring, metal stud framing, drywall, acoustical ceili | City Of Asheville | — |
| Aug 13, 2025 | Com: Low Voltage | ADDING AN ADDRESSABLE RELAY TO THE FIRE ALARM SYSTEM TO RELEASE THE LOBBY DOOR ON THE 4TH FLOOR WHEN THE FIRE ALARM ACTIVATES FOR OCEAN ASHEVILLE. | City Of Asheville | — |
| Aug 13, 2025 | Fire: Fire Alarm | ADDING AN ADDRESSABLE RELAY TO THE FIRE ALARM SYSTEM TO RELEASE THE LOBBY DOOR ON THE 4TH FLOOR WHEN THE FIRE ALARM ACTIVATES FOR OCEAN ASHEVILLE. | Asheville | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled15
- Documents submitted2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.